Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

697results about How to "Prevent water seepage" patented technology

Shield tunnel portal sealing device and shield tunnel portal sealing method

The invention belongs to the technical field of shield tunnel engineering and particularly relates to a shield tunnel portal sealing device and a shield tunnel portal sealing method. The shield tunnel portal sealing device comprises a lined wall, an embedded steel ring is arranged on the lined wall, a sealing box is arranged on the embedded steel ring and comprises a sealing steel ring, a fixing plate, a fold type support plate and two waterproof structures, a plurality of grease injecting holes are evenly circumferentially reserved in the sealing steel ring between the two waterproof structures, each waterproof structure comprises a steel wire brush and a cord fabric rubber plate, the cord fabric rubber plates are arranged on one side close to the embedded steel ring, and grouting holes are reserved in the lined wall and in the sealing steel ring on the inner sides of the cord fabric rubber plates. The shield tunnel portal sealing device has the advantages that the cord fabric rubber plates are primarily used for sealing to prevent a major part of water and soil from pouring out, so that 'pouring prevention' is achieved; water penetration is prevented as the steel wire brushes secondarily achieve seamless contact with a shield tunneling machine shell or duct pieces; and the grouting holes reserved in the lined wall and the sealing steel ring can achieve grouting sealing timely in emergencies.
Owner:CCCC SECOND HARBOR ENG

Water-rich weak surrounding rock long-and-big tunnel construction method

The invention discloses a water-rich weak surrounding rock long-and-big tunnel construction method. The method includes that a tunnel inclined shaft is arranged on one side of a main tunnel of a tunnel to be constructed, the main tunnel is divided into a tunnel entry section, a tunnel exit section and a middle connecting section connected between the tunnel entry section and the tunnel exit section, the middle connecting section is divided into an inclined shaft assisting construction entry section and an inclined shaft assisting construction exit section, and each of the tunnel entry section, the tunnel exit section, the inclined shaft assisting construction entry section and the inclined shaft assisting construction exit section is divided into multiple sections for construction. A construction method of each section includes: step 1, performing geological forecasting in advance, and when a debris flow formation exists ahead, entering a step 2, or else, entering a step 3; step 2, performing stability control construction; step 3, determining a primary supporting scheme; step 4, excavating the tunnel, and performing primary supporting construction; step 5, performing secondary lining construction on the tunnel. The water-rich weak surrounding rock long-big tunnel construction method is simple in step, reasonable in design, simple and convenient to construct, good in using effect, capable of meeting construction requirements of water-rich weak surrounding rock long-and-big tunnels, short in construction period and safe in construction process.
Owner:CHINA RAILWAY 20 BUREAU GRP

Submersed type inspection well and construction method thereof

InactiveCN101684669ASolve the contradiction that the retention interval is too shortEasy constructionSewerage structuresDowntown areaWellbore
The invention discloses a submersed type inspection well which comprises a well cover above the ground as well as a shaft and a well body structure below the well cover, wherein the traditional drainage pipe is arranged below the shaft, a foundation is arranged between the lower end of the shaft and the drainage pipe, and the lower end of the shaft, the upper end of the foundation and the pipe arepoured into a whole; the diameter of the foundation is larger than the outer diameter of the shaft, and the bottom end of the foundation is located below the sheath of the traditional drainage pipe;and the bottom end of the foundation is inwards extended below the traditional drainage pipe. The invention also discloses a construction method for realizing the inspection well, which comprises thefollowing construction stages: (1) placing the inspection well; (2) submersing, joining and measuring the shaft; (3) manufacturing the foundation of the inspection well and communicating the shaft with the traditional drainage pipe; and (4) mounting a shaft cover plate and a ladder. By adopting the structure and the method of the invention, the inspection well is conveniently manufactured by adopting a submersed type construction method so as to be beneficial to carrying out long-distance jacking pipe construction and developing novel prefabricated inspection well structures and convenient for carrying out pipe engineering construction in downtown areas without excavating.
Owner:吴纪东 +1

Asphalt pavement curing agent as well as preparation method and application thereof

The invention discloses an asphalt pavement curing agent which comprises A components and B components which are mutually independent, wherein the A components comprise epoxide resin, an organic solvent A, carbon black, a dispersing agent, a permeating agent and a heat stabilizer A; the B components comprise a curing agent, an organic solvent B, asphalt, an asphalt regenerant and a heat stabilizer B; the curing agent is cashew-nut oil modified amine. The preparation method comprises the following steps of: firstly sequentially adding the A components into a stirring kettle, storing a dispersion liquid prepared after dispersion; sequentially adding the B components to the stirring kettle, and storing in a sealing way after the dispersion. When the asphalt pavement curing agent is applied, the A components and the B components are uniformly mixed on site, the mass ratio is controlled to (1:1)-(2:1), then aggregates are added, spread and compacted, and the asphalt pavement curing agent is directly coated on an asphalt pavement at normal temperature without being heated or diluted during construction application. The asphalt pavement curing agent disclosed by the invention can be used for reducing and regenerating aged asphalt, outstandingly reducing the water penetration coefficient of the asphalt pavement and improving the pavement property.
Owner:HUNAN YUNZHONG REGENERATION TECH CO LTD

Sealing device for slurry shield starting of water-rich sand layer and sealing control method for starting

The invention relates to the field of tunnel shield construction, in particular to a sealing device for slurry shield starting of a water-rich sand layer and a sealing control method for the starting, and solves the problem that the conventional sealing devices are poor in effect, and high in risk, and water leakage and grout leakage are easy to occur during a shield starting process. Grease distributing valves are additionally arranged on shield tail grease filling pipes; an external steel loop is connected with a tunnel portal steel loop; two wire brushes are arranged in the external steel loop; grease injection holes with gate valves are reserved between the wire brushes; after the shield is assembled on a starting base, grease is smeared on the wire brushes of the external steel loop; a cutter head is pushed to a station space enclosing structure; the grease injection pipes are connected with the grease injection holes reserved in the external steel loop and the grease distributing valves; the grease injection gate valves are opened to enable the grease to be injected between the two wire brushes from the grease injection holes reserved in the external steel loop to fill the interspace; slurry balance is built to conduct shield starting. According to the invention, slurry shield safe starting is realized; slurry shield starting technology is simplified greatly; the technology is simple; the technique is advanced; the practicability is high.
Owner:CHINA RAILWAY 12TH BUREAU GRP +1

Waterproof curtain and construction method thereof

In the embodiment of the present invention, the water-stop curtain is formed on the outside of the foundation pit wall by the cement mixing pile and the cast-in-place pile being occluded, making full use of the bending resistance performance of the cast-in-place pile and the water-stop performance of the cement mixing pile, so that the operation is safe and the water-forming Reinforced concrete piles are neat and regular; cement mixing piles are used to occlude casing piles to form a water-stop curtain, which can effectively prevent water seepage, water leakage and quicksand in traditional foundation pits, and can effectively prevent collapse, necking and other types of punching and drilling The quality of piles is a common problem; compared with traditional underground diaphragm walls and bored occlusal piles, the construction speed is faster, the cost is lower, and the economic benefits are obvious; the cement mixing piles are constructed first to form the constraints of casing piles and avoid the casing piles. The problem of diameter expansion in soft soil layers; the use of casing piles for support, and the use of cement mixing piles to consolidate and harden the soil, reduce the excavation of earthwork and the impact on the surrounding geology, and reduce the impact of construction on the surrounding environment Impact and environmental pollution, green construction.
Owner:深圳市鸿荣轩建设工程有限公司 +1

Paint brushing construction method

The invention relates to a paint brushing construction method, which sequentially comprises the following steps of brick wall base surface cleaning, base layer brushing, putty priming and surface layer rolling coating. According to a method adopted in the base layer brushing step, firstly, a brick wall base surface is moistened through water spreading, a layer of cement paste is brushed, then, cement mortar is used for brushing, the first layer brushing thickness is 0.08 to 0.1cm, the second layer brushing thickness is 0.05 to 0.08cm, then, the scraping leveling is carried out through a darby, and finally, the floating leveling is carried out through a wood float. According to a method adopted in the putty priming step, the priming is carried out in two layers, the first layer putty priming thickness is 0.3 to 0.5cm, the second layer putty priming is carried out after 22 to 26 hours, the priming thickness is 0.2 to 0.3cm, and two work procedures of grinding leveling machine and sand paper are adopted for grinding leveling after the natural maintenance. According to a method in the surface layer rolling coating step, firstly, a layer of paint is brushed on the putty surfaces primed in the former step, the paint rolling coating is carried out once again after 3 to 5 hours, and then, the maintenance is carried out. The surface layer brushed according to the construction method is smooth, flat and uniform without cracks, in addition, convex-concave corners of wall posts are made into micro arc shapes, the appearance is attractive, simple and compact, and the dust accumulation cannot easily occur.
Owner:无锡市康顺节能材料科技有限公司

Hands-free cleaning apparatus for roller pads and/or paintbrushes

ActiveUS20100300500A1Water/paint to be drained more efficientlyEffective drainageLiquid surface applicatorsBrushesSpray nozzleHands free
According to principles of the present invention, a hands-free cleaning apparatus enables a user to clean roller pads of various pad lengths and / or paintbrushes using a single apparatus. In one embodiment, for example, the cleaning apparatus includes a main housing and a lid. An attachment mechanism is preferably provided on the lid or main housing to receive and retain a roller pad or a brush in a desired position and relationship within the cleaning apparatus. A spraying mechanism having one or more spray nozzles is preferably arranged in the housing to spray water (or other cleaning solution) on the pad or brush in a desired manner. A hose attachment can supply water to the apparatus. The spraying mechanism preferably receives water from an attached hose. The spray tips or nozzles are preferably provided at desired locations along the spraying mechanism to provide a desired spray pattern for spinning and cleaning the pad or brush. In one configuration, each spray tip is arranged with a spray direction that is slightly offset from one another in relation to the surface of the roller pad or brush being cleaned, thus helping to force rotation. The bottom of the apparatus can also include a drain hole to allow water and paint to be dispensed as the pad or brush is being cleaned, and legs to support the apparatus a desired distance above a supporting surface, thus allowing water and paint to be drained more efficiently. The lid preferably engages the body in a sealing relationship to prevent spillage during operation of the apparatus. A handle can be a part of the lid to provide easy portability of the cleaning apparatus. A protrusion or extension can also be included as part of the lid to seal off the attachment mechanism and prevent water seepage and to also act as a stabilizer for the roller bar or brush adapter.
Owner:MCPHEE III WILLIAM JAMES

Deep foundation pit supporting structure

The invention discloses a deep foundation pit supporting structure. The deep foundation pit supporting structure comprises a soil nail retaining pile which is attached to the side wall of a foundation pit, wherein the outer side of the soil nail retaining pile is provided with a water stop supporting pile of which one end is embedded into a soil body under the foundation pit, the middle part of the water stop supporting pile is provided with a horizontal lateral-resisting top beam, and a lateral-resisting reinforcing pile is arranged below the lateral-resisting top beam. According to the deep foundation pit supporting structure disclosed by the invention, the soil nail retaining pile is attached to the side wall of the foundation pit for retaining soil, the water stop supporting pile can be used for preventing the water seepage of the pile body while being used for supporting the soil nail retaining pile, the lateral-resisting reinforcing pile which is additionally arranged at the outer side of the water stop supporting pile can be used for further supporting the soil nail retaining pile and the water stop supporting pile, the strength of the deep foundation pit supporting structure can be effectively ensured, better-quality and safer protection can be supplied for a deep foundation pit, and the deep foundation pit supporting structure disclosed by the invention is applied to the field of architectural structure construction.
Owner:GUANGDONG TIANJING CONSTR

One-component flexible polymer waterproof mortar material and method for preparing waterproof mortar by using one-component flexible polymer waterproof mortar material

The invention relates to a one-component flexible polymer waterproof mortar material and a method for preparing waterproof mortar by using the one-component flexible polymer waterproof mortar material. The waterproof mortar material comprises the following powder: cement, sand, rubber powder, cellulose, fiber, silica fume, a defoaming agent, a water reducing agent, a waterproof agent and the balance of a silicon-aluminum material. According to the selected value ranges, the specific powder is selected, matched and added into a stirring device for sufficiently stirring, and a finished product of the one-component flexible polymer waterproof mortar material can be obtained after evenly mixing. The method for preparing waterproof mortar comprises the steps of burdening, adding water and mixing, and treating. The one-component flexible polymer waterproof mortar material and the method have the advantages that the flexible polymer waterproof mortar obtained after evenly mixing the waterproof mortar material and the water has the durability of mortar and certain flexibility so as to prevent cracking and water seepage, and meanwhile the flexible polymer waterproof mortar is ultra-thin, high in anti-permeability, high in wear resistance, good in anti-permeability and waterproof performance, proper in strength, and good in flexibility, impact resistance and cohesive property. The preparation method of the waterproof mortar is easy to grasp and high in efficiency, and can be used for guaranteeing the product quality.
Owner:WUHAN YUANJIN BUILDING MATERIALS TECH CO LTD

Continuously reinforced plastic heat-preserving composite pipeline used for oil field ground and its manufacturing technique

The present invention discloses a continuous reinforced plastic composite pipe and the production technique for buried heat insulation of oil field; the continuous reinforced plastic composite pipe consists of an anticorrosive coating, a reinforced layer and a coating layer; crosslinked polyethylene foamed material is continuously rolled on the continuous reinforced plastic composite pipe to form a continuous insulating course, and fluid sealant layers are respectively coated between the coating layer and the insulating layer, the insulating layer and the protective layer. The reinforced layer is weaved by metal steel wires; the anticorrosive coating and the coating layer are made of crosslinked polyethylene material; the protective layer is made of polyethylene; the insulating course is made of crosslinked polyethylene foam. The pipe of the present invention is a long-distance flexible continuous pipe; the insulating course is made of crosslinked polyethylene flexible material; the continuous reinforced plastic composite pipe has good memory, rebound resilience and concentricity inside and outside the pipeline and ensures that the continuous heat insulation pipeline prevents being squashed after being coiled and buried; thereby the thickness of the insulating course is consistent and achieving better heat insulation effect. The pipeline paved by the invention, even if the local part is damaged, water can be effectively prevented to seep into the insulating course in order to ensure the heat insulation effect.
Owner:长春高祥特种管道有限公司

Interior wall plastering mortar and construction method thereof

The invention provides interior wall plastering mortar, which is prepared by mixing the following components in part by weight: 30 to 35 parts of ordinary Portland cement, 4 to 5 parts of hydrated lime, 5 to 10 parts of light aggregate, 50 to 60 parts of heavy aggregate, and 1.0 part of C-type composite auxiliary, wherein the light aggregate is an inorganic vitrified hollow cellular material of which the fineness is lower than 100 meshes; the heavy aggregate is ordinary river sand; and the C-type composite auxiliary is sold by Guangzhou Hecheng Trading Company. The construction method for the interior wall plastering mortar comprises the following steps: diluting the light energy-saving interior wall plastering mortar with water accounting for 30 to 50 percent of the weight of the mortar; and mechanically or manually stirring the diluted mortar until the mortar is mixed uniformly to achieve the viscosity suitable for mechanical spraying or manual construction. Therefore, the mortar can be sprayed mechanically or constructed manually. The interior wall plastering mortar has light weight and energy conservation, can prevent hollowness, cracking and falling off by being matched with a light wall body, can effectively reduce cracking of the mortar, ensures the quality of construction work, has the advantages of heat insulation and noise reduction, low cost of unit area, good grain composition, good peaceability, mechanical construction contribution and simple process.
Owner:SHENZHEN GRANDLAND DECORATION GROUP

Ventilated air conditioning wall for multi-storey building

The invention discloses a ventilated air conditioning wall for a multi-storey building. The ventilated air conditioning wall comprises a water supply device and a heat exchange wall, wherein the water supply device comprises a water supply pipe, a flow regulating valve and a spray device, the flow regulating valve is arranged on the water supply pipe, and the spray device is communicated with the water supply pipe; the heat exchange wall comprises an external thermal insulating wall, an internal thermal insulating wall, a filtering drainage piece, an air inlet, a ventilated heat exchange interlayer, an activated carbon filtering layer and an air induced feeder, a gap between the external thermal insulating wall and the internal thermal insulating wall serves as the ventilated heat exchange interlayer, the activated carbon filtering layer and the filtering drainage piece are arranged in the ventilated heat exchange interlayer, the air inlet is arranged on the external thermal insulating wall, and the air induced feeder is arranged in the internal thermal insulating wall; the spray device is arranged in the ventilated heat exchange interlayer, and located between the activated carbon filtering layer and the filtering drainage piece; and the part, below the air inlet, of the ventilated heat exchange interlayer serves as a water return pool, and a water return pipe is communicated with the water return pool through a water return regulating valve. According to the invention, air is subjected to heat exchange and humidification through spraying cool water to an inner cavity of a wall in summer and spraying hot water to the inner cavity of the wall in winter, and then the air is fed indoors so as to achieve the purpose of ventilated air conditioning.
Owner:JIANGXI UNIV OF SCI & TECH

Artificial stone plate and curtain wall thereof

The invention relates to an artificial stone plate and a curtain wall thereof. The artificial stone plate comprises a stone plate made of a concrete material. Two layers of steel wire meshes are embedded in the stone plate; two rows of fastening nuts are embedded in a back surface of the stone plate; inner ends of the fastening nuts are connected to a strip plate between the two layers of the steel wire meshes; the fastening nuts penetrate through one layer of the steel wire meshes; and the outer ends of the fastening nuts reach the back surface of the stone plate. The artificial stone plate has the advantages of light weight, low cost, and convenient and fast installation, overcomes the disadvantages of high cost of stone installation framework, and complex program and high labor cost for stone slotting, punching and fixed installation; the surface of the stone is treated by a plurality of surface treatment methods, thereby achieving a decoration effect of natural stone completely; and a hydrophobic layer can effectively prevent phenomena of water seepage, discoloration and efflorescence. The artificial stone plate is synthesized by using regenerated resources, overcomes the disadvantages of large disruption to the environment and radiation pollution in stone exploration, has the advantages of low cost and environment protection, and has very good economic benefits and social benefits.
Owner:钟兵

Polymer-based film waterproofing agent mixed with cement, and preparation method thereof

The present invention relates to a polymer-based film waterproofing agent mixed with cement which is coated on a structure requiring waterproofing and water leakage prevention so as to show excellent chemical resistance, weather resistance, crack resistance and impact resistance and high tensile strength in addition to waterproofness by preventing penetration of water into the structure, and a preparation method thereof. The polymer-based film waterproofing agent mixed with cement of the present invention comprises: 65-75 wt% of an acrylic emulsion; 12-20 wt% of micro-cement; 10-18 wt% of quicklime; 0.02-0.2 wt% of a superplasticizer; 0.02-0.2 wt% of an antifoaming agent; and 0.02-0.2 wt% of an expansion agent. The preparation method comprises: the first step of preparing 65-75 wt% of an acrylic emulsion in a liquid state in a first circular container; the second step of preparing 12-20 wt% of micro-cement in a powder state, 10-18 wt% of quicklime, 0.02-0.2 wt% of a superplasticizer, 0.02-0.2 wt% of an antifoaming agent, and 0.02-0.2 wt% of an expansion agent in a second circular container; and the third step of pouring the contents prepared in the second circular container into the first circular container to dilute the same with an electric mixer.
Owner:河泰薰

Metal roof structure

The invention discloses a metal roof structure. A steel lining plate is arranged on the bottommost layer of the roof structure, an aluminum-magnesium-manganese alloy roof panel is arranged on the topmost layer of the roof structure, a support steel plate and a gypsum fiber plate are arranged between the aluminum-magnesium-manganese alloy roof panel and the lining plate, the support steel plate is supported at the bottom of the gypsum fiber plate, a superfine glass cotton noise proofing layer is filled between the aluminum-magnesium-manganese alloy roof panel and the gypsum fiber plate, support purlines are arranged at the bottom of the support steel plate, a non-woven fabric dustproof layer is paved on the lining plate, a glass cotton sound-absorbing layer is arranged on the non-woven dustproof layer, heat-preserving cotton is filled among the glass cotton sound-absorbing layer and the support purlines, a vapor barrier layer is arranged between the heat preservation cotton and the glass cotton sound-absorbing layer, and a water-proofing and vapor-permeating layer is arranged between the superfine glass cotton noise proofing layer and the gypsum fiber plate. Waterproof effect of a metal roof is improved, outdoor noise is prevented from being transmitted into a room, and a heat preserving, a damp proofing effect and a vapor permeating of the metal roof are improved.
Owner:ZHONGTIAN CONSTR GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products