Construction method of underground diaphragm wall
An underground diaphragm wall and construction method technology, applied in artificial islands, sheet pile walls, water conservancy projects, etc., can solve problems such as enlarged joints, safety risks of foundation pits, hidden dangers of durability, etc., to prevent water seepage and improve anti-seepage. Ability, the effect of prolonging the curing time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Example Embodiment
[0015] Example 1
[0016] The construction method of an underground continuous wall of the present invention includes the following steps: (1) excavating a 6m long, 0.6m wide, and 20m deep trench at a predetermined position, placing a steel cage, and pouring the initial setting and final setting Long-term concrete forms an underground connecting wall section; (2) Excavate trenches adjacent to the already formed underground connecting wall section, place steel cages, pour ordinary concrete to form an underground connecting wall section, and two adjacent sections Reserve a space of 0.5 meters between the wall sections of the underground connecting wall to ensure that the joints can be effectively overlapped; (3) After the two sections of underground continuous wall are poured, when the concrete has not yet reached the setting, use a diameter of 0.8 at the joint of the two walls. The hole is made by the rotary pile digging machine with a sleeve, and concrete is poured into the hole,...
Example Embodiment
[0017] Example 2
[0018] The construction method of an underground continuous wall of the present invention includes the following steps: (1) excavating a trench with a length of 6m, a width of 0.8m and a depth of 25m at a predetermined position, placing a reinforcement cage, and pouring the initial setting and final setting Long-term concrete forms an underground connecting wall section; (2) Excavating trenches adjacent to the already formed underground connecting wall section, placing a steel cage, and pouring concrete with a long initial and final setting time to form the underground connecting wall Section, a space of 0.6 meters is reserved between the two adjacent underground connecting wall sections to ensure that the joints can be effectively overlapped; (3) After the two underground continuous wall sections are poured, the concrete has not yet reached the setting. The wall joints are made with a 1.0-meter diameter rotary pile machine with a sleeve. A steel cage is placed...
Example Embodiment
[0019] Example 3
[0020] An underground continuous wall construction method of the present invention includes the following steps: (1) excavating a 6m long, 1m wide, and 25m deep trench at a predetermined position, placing a steel cage, and pouring the initial setting and final setting time Longer concrete forms the underground connecting wall section; (2) Digging trenches adjacent to the already formed underground connecting wall section, placing steel cages, and pouring concrete with longer initial and final setting time to form the underground connecting wall section , Reserve a 0.8-meter gap between two adjacent underground connecting wall sections to ensure that the joints can be effectively overlapped; (3) After the two underground continuous wall sections are poured, the concrete still has not reached the setting, when the two walls At the joints of the webs, a 1.2-meter-diameter rotary pile machine with a sleeve is used to form holes, a steel cage is placed in the holes,...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap