Tunnel lining structure filled with ceramic particles and construction method
A ceramsite and tunnel technology, applied in the field of tunnel lining structure and construction, can solve the problems of large deformation of the surrounding rock of the tunnel, extrusion deformation damage, and the absence of devices, and achieve the effects of reducing strength, small dead weight, and low noise.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Such as Figure 1-8 , A tunnel lining structure filled with ceramsite, which includes a surrounding rock 1, an anchor rod 2 anchors the inherent initial support 3 on the tunnel rock mass of the surrounding rock 1, and the inner layer of the initial support 3 is laid There is a waterproof layer 4, and a ceramsite filler 5 is laid on the inner layer of the waterproof layer 4, a steel arch 7 is set inside the ceramsite filler 5, and a secondary lining 8 is poured on the inner side of the steel arch 7. By adopting the above-mentioned tunnel lining structure, the initial support 3 shall be implemented in time after the tunnel is excavated. The basic form is shotcrete and anchor rod 2. Then, ceramsite filler 5 is set as a filling type on the basis of reserved deformation joints. Lining, followed by laying waterproof layer 4, the secondary lining 8 adopts the form of erecting steel arch frame and pouring integrally moulded concrete to give full play to the bearing capacity of s...
Embodiment 2
[0050] Any construction method of a tunnel lining structure filled with ceramsite is characterized by including the following steps:
[0051] Step1: Before excavating the tunnel, apply grouting with a radially advanced small pipe. The small pipe uses a seamless steel pipe with a diameter of 30-50mm and a length of 25-40mm. The selection of grouting materials, the ratio and the grouting pressure are all controlled. The test confirmed that high-pressure grouting pump is used for grouting;
[0052] Step2: After the tunnel is excavated, implement the initial support 3 in time, install the steel mesh, install the anchor rod 2, mix the concrete mixture mixed with the accelerator and water into a slurry, and spray it on the wall of the cave to set;
[0053] Step3: Install automatic pressure gauge 6 to measure the deformation of surrounding rock;
[0054] Step4: Laying waterproof layer 4, using coiled material waterproof layer, laying on the full section of the arch and side wall, the materia...
PUM
Property | Measurement | Unit |
---|---|---|
diameter | aaaaa | aaaaa |
length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com