[0013] The technical solutions in the embodiments of the present application will be described below with reference to the drawings in the embodiments of the present application.
[0014] It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures. Meanwhile, in the description of the present application, the terms "first", "second" and the like are only used to distinguish descriptions, and cannot be understood as indicating or implying relative importance.
[0015] Please see figure 1 , figure 1 It is a schematic flow chart of a BIM-based inspection and registration method for auxiliary monitoring images of traction substations provided by the embodiment of the present application.
[0016] After research by the applicant, it was found that during the installation of monitoring equipment in railway substations, ...