Project cost progress management method and system and storage medium

A technology for progress management and project cost, applied in the field of project cost, which can solve problems such as high cost and effective control of project cost

Active Publication Date: 2020-08-21
大为国际工程咨询有限公司
View PDF14 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The existing technical solutions mentioned above have the following defects: the project cost control still needs to be carried out according to the plan, and an important part of the project cost is the control of the cost of building materials, and the cost of building materials also fluctuates with time. Proceeding with planning often leads to the fact that the price of the purchased building materials is often not necessarily the lowest, resulting in higher costs and affecting the effective management and control of the project cost schedule

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project cost progress management method and system and storage medium
  • Project cost progress management method and system and storage medium
  • Project cost progress management method and system and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0054] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0055] refer to figure 1 , is a project cost schedule management method disclosed in the present invention, comprising steps S100 to S400.

[0056] In step S100, the planning completion period of different construction steps in the construction project and the theoretical three-dimensional view of the construction site when the corresponding construction steps are completed are acquired.

[0057] Among them, the planning completion period of different construction steps and the theoretical three-dimensional view of the construction site when the corresponding construction steps are completed are pre-set and stored in the database, and the planning completion period of different construction steps and corresponding construction steps can be obtained by searching the database A theoretical 3D view of the construction site at completion.

[0058] In step S200,...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a project cost progress management method and system and a storage medium in the technical field of engineering cost, the problem that project cost management and control still needs to be carried out according to a plan is solved; the building material cost fluctuates along with time, if the building material cost fluctuates along with time, the price of purchased building materials is often not necessarily lowest, the cost is high, and effective control over the project cost progress is affected. The method comprises the steps of acquiring a theoretical three-dimensional view; recording the actual completion period of the construction steps in real time; predicting the completion period of future construction steps; and analyzing and determining proper building material suppliers and delivery time of corresponding building materials. The planning completion period of the future construction steps is effectively predicted, and based on the conditions of the building material suppliers, the building material supplier which meets the time requirements of the construction steps and can provide the lowest cost can be selected as the building material supplier,so that the building material cost is effectively controlled.

Description

technical field [0001] The present invention relates to the technical field of engineering cost, in particular to a method, system and storage medium for managing the progress of engineering cost. Background technique [0002] The project cost refers to the construction cost of the project, that is, all the fixed asset investment expenses expected or actually paid for the construction of a project. Strengthening project cost management, that is, project cost management, is the focus of current project management risk control. The content included in cost management mainly includes cost planning, cost control, cost accounting, cost analysis and so on. [0003] The existing publication number is CN109657927A and the name is a whole-process cost progress supervision system and method. Its technical points are: including: a project start-up module, used to create a project cost process; a process planning module, used to , plan and arrange the project cost to obtain the plan s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q10/10G06Q30/02G06Q50/08
CPCG06Q10/04G06Q10/06313G06Q10/06315G06Q10/103G06Q30/0206G06Q50/08Y02P90/30
Inventor 袁松段小文
Owner 大为国际工程咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products