A train control method, device, equipment and medium
A train control and train technology, applied in the fields of equipment and media, devices, and train control methods, can solve problems such as inaccurate calculations, and achieve the effect of ensuring safety and improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] figure 1 The schematic diagram of the first train control process provided by the embodiment of the present invention, the process includes the following steps:
[0030] S101: Determine the starting parking position according to the train stopping position and the preset safety distance, and obtain the first actual speed when the train arrives at the starting parking position and the road gradient correspondence between the starting parking position and the stopping position slope information, wherein the slope information includes slope angle and slope direction.
[0031] The train control method provided by the embodiment of the present invention is applied to the ATO equipment, and the ATO equipment belongs to the automatic train operation equipment in the Communication Based Train Control System (CBTC).
[0032] In the embodiment of the present invention, in order to ensure the safety of train running, during the train running, the ATO device can periodically acqui...
Embodiment 2
[0054] In order to simplify the process of determining the target travel speed corresponding to each control time point, on the basis of the above embodiments, in the embodiment of the present invention, the first actual speed, the pre-saved train configuration information and the The slope acceleration value, based on the pre-saved safe braking distance curve model, determines the target travel speed corresponding to each control time point during the travel of the train from the start parking position to the stop position, including:
[0055] According to the first actual speed, the pre-saved train configuration information and the gradient acceleration value, determine the travel time corresponding to each sub-line segment in the broken line of the travel speed and travel time corresponding to the safe braking distance curve model saved in advance and the target acceleration value in each driving duration;
[0056] According to the travel time of each sub-straight line segm...
Embodiment 3
[0066] In order to accurately determine the travel time corresponding to each sub-straight line segment and the target acceleration value within each travel time, on the basis of the above-mentioned embodiments, in the embodiment of the present invention, the The stored train configuration information and the slope acceleration value determine the corresponding travel speed and travel time of the pre-saved safe braking distance curve model, the travel time corresponding to each sub-line segment and the target within each travel time Acceleration values include:
[0067]If the broken line corresponding to the travel speed and travel time of the pre-saved safe braking distance curve model includes: the traction delay straight line segment, according to the first actual speed and the train speed and acceleration value in the pre-saved train configuration information According to the corresponding relationship, the first sub-target acceleration value corresponding to the tractio...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


