Super high-rise construction protection operation platform system and construction method
A work platform and super high-rise technology, applied in the directions of construction, scaffolding accessories, housing structure support, etc., can solve the problems of limited use, poor safety, complex structure, etc., and achieve improved safety, strong adaptability, and smooth climbing. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0064] Such as figure 1 As shown, a super high-rise construction protection work platform system provided in this embodiment includes a wall attachment device 2 , a hydraulic cylinder 4 , a jacking device 5 , a guide rail 6 and a frame body 7 .
[0065] combine figure 1 and figure 2 As shown, the cross-section of the guide rail 6 is I-shaped, and a plurality of guide rail hooks 61 with openings facing downwards are arranged at intervals on the flange plate of the guide rail 6 facing the building structure 1 . The guide rail 6 can include several guide rail standard sections, which are spliced and fixed by splicing plates. The frame body 7 is fixed on the guide rail 6 .
[0066] Such as figure 2 As shown, one end of the wall attachment device 2 is fixed on the building structure 1, and the other end is provided with a supporting device 3, which extends out of the building structure 1, and the building structure 1 is a structural beam or a floor plate. As an example, su...
Embodiment 2
[0077] The present embodiment provides a kind of construction method of super-high-rise construction protection work platform system, will combine below Figure 1 to Figure 14 This construction method will be further explained. This construction method comprises the steps:
[0078] Step 1. Complete the assembly of the super high-rise construction protection work platform system. Specifically, the splicing and assembly of the guide rail 6 is completed on the ground; the wall attachment device 2 is installed on the building structure 1 of the built floor; the guide rail 6 is lifted, and the guide rail 6 is suspended on the load-bearing shaft of the support device 3 through the guide rail hook 61; The guide rail limit assembly of the support device 3 and the jacking device 5 is buckled on the flange plate on the side of the guide rail 6 facing the building structure 1; , The oil cylinder pin shaft 2 53 of the jacking device 5 is hinged;
[0079] Step 2: When the frame body 7 n...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com