Construction waste recycling treatment device
A technology for processing equipment and construction waste, applied in the direction of unloading equipment, manufacturing tools, etc., can solve the problems of increasing accident risks, the inability of automatic and rapid demoulding of bricks, and the inability of brick pressing machines to work efficiently. Efficient and stable brick-making work, avoiding the effect of manual-assisted demoulding work
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Such as Figure 1-7A recycling processing device for construction waste is shown, which includes a fixed plate 1, and two sets of fixed plates 1 are arranged, and a connecting column 2 is fixedly connected between the centers of the upper surfaces of the two sets of fixed plates 1, and the upper surface of the connecting column 2 is fixed There are two sets of fixed rods 12 connected, and the top ends of the two sets of fixed rods 12 are fixedly connected with flanges 13. The two sets of flanges 13 are fixedly connected with the frame of the brick press machine through bolts and nuts, so that the device can be pressed with bricks. The frame of the machine is stably connected, and the corresponding side walls of the two sets of fixed plates 1 are clamped and fixed with the pressing plate 3 through the limit auxiliary locking mechanism, and the top plate 4 is fixedly connected between the two sets of fixed plates 1, and the two sets of The fixed plate 1, two sets of press...
Embodiment 2
[0037] Embodiment 2 is a further improvement to Embodiment 1.
[0038] Such as Figure 1-7 The construction waste recycling treatment device shown includes a fixed plate 1, and there are two groups of fixed plates 1, and three sets of through grooves 101 are opened on the opposite side walls of the fixed plate 1, and the center of the upper surface of the two sets of fixed plates 1 There is a connecting column 2 fixedly connected between them, the connecting column 2 is set as a "C" shape, the connecting plate 9 is fixedly connected on the opposite side wall of the connecting column 2, and the center of the upper surface of the connecting plate 9 is provided with a hole 901, The corresponding side walls of the two sets of fixed plates 1 are clamped and fixed with abutment plates 3 through the auxiliary locking mechanism of the limit, and the top plate 4 is fixedly connected between the two sets of fixed plates 1, and the top plate 4 corresponds to the connecting plate 9 The u...
Embodiment 3
[0040] Embodiment 3 is a further improvement to Embodiment 1.
[0041] Such as Figure 1-7 The construction waste recycling treatment device shown includes a fixed plate 1, and there are two groups of fixed plates 1, and three sets of through grooves 101 are opened on the opposite side walls of the fixed plate 1, and the center of the upper surface of the two sets of fixed plates 1 There is a connecting column 2 fixedly connected between them, the connecting column 2 is set as a "C" shape, the connecting plate 9 is fixedly connected on the opposite side wall of the connecting column 2, and the center of the upper surface of the connecting plate 9 is provided with a hole 901, The corresponding side walls of the two sets of fixed plates 1 are clamped and fixed with abutment plates 3 through the auxiliary locking mechanism of the limit, and the top plate 4 is fixedly connected between the two sets of fixed plates 1, and the top plate 4 corresponds to the connecting plate 9 The u...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


