Subway environmental control machine room fabricated electromechanical construction method based on BIM technology

A construction method and assembly technology, applied in industrial construction, special data processing applications, geometric CAD, etc., can solve labor costs, machine tool usage costs, save material costs, high management costs, many unforeseen problems, high visa change costs, etc. problems, to achieve the effect of improving project quality, improving budget control ability, and reducing the workload of demolition and modification

Pending Publication Date: 2021-04-09
南通装配式建筑与智能结构研究院 +1
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, the traditional electromechanical construction method of the subway environmental control computer room has labor costs, machine tool usage costs, material saving costs, high management costs, slow progress in the construction period, high visa change costs, serious rework, and many unforeseen problems. Risk factors are higher, problems such as work efficiency are lower, therefore, urgently need a kind of improved technology to solve this problem existing in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Subway environmental control machine room fabricated electromechanical construction method based on BIM technology
  • Subway environmental control machine room fabricated electromechanical construction method based on BIM technology
  • Subway environmental control machine room fabricated electromechanical construction method based on BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0026] see Figure 1-2 , the present invention provides a technical solution: an assembly-type electromechanical construction method based on BIM technology for a subway environmental control computer room, characterized in that it includes the following steps:

[0027] Step 1: 3D scanning environment. Firstly, 3D laser scanning is performed on the site through 3D laser scanning equipment to obtain the point cloud data of the site, and then the BIM model is ob...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a subway environmental control machine room fabricated electromechanical construction method based on a BIM technology. The method comprises the steps of obtaining a BIM model on a 3D laser scanning site, comprehensively optimizing an electromechanical system model, performing die assembly through various professional models, completing basic model optimization and prefabricating a processing part, through a material statistics function of BIM software, generating required processing part materials and processing styles, carrying out prefabrication processing, using a robot to accurately locate parts, and using a BIM lofting robot to carry out traditional operation modes on a plurality of professional projects at the same time on site. According to the invention, the working efficiency of equipment installation and system debugging is greatly improved, the labor cost, the machine tool use cost, the material cost, the management cost and the like are reduced, the budget control capability is greatly improved, the quality is improved, the rework is greatly reduced, the engineering quality is improved, the safety is improved, problems are predicted in advance, dangerous factors are reduced, the working efficiency is greatly improved, and the disassembly and modification workload is reduced.

Description

technical field [0001] The invention relates to the technical field of an assembled electromechanical construction method for a subway environmental control computer room based on BIM technology, and specifically relates to an assembled electromechanical construction method for a subway environmental control computer room based on BIM technology. Background technique [0002] As the country advocates the popularization of BIM system, more and more construction projects based on BIM, among which the subway project is quite responsive to it, and prefabricated installation is a challenge to the traditional construction industry, prefabricated installation Definition: Planning and processing the pipelines in a project in advance, and then assembling and lapping the processed parts on site, thus saving construction time, avoiding cross-construction operations, reducing material loss and personnel configuration, saving construction costs. With the development of BIM, prefabricated...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13E04G21/00E04H5/02
CPCE04G21/00E04H5/02G06F30/13
Inventor 李强徐海洋宫海吴锡军
Owner 南通装配式建筑与智能结构研究院
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products