Completion method for intelligent production and dynamic monitoring of flow regulation and water control of oil and gas well
A technology of intelligent production and dynamic monitoring, applied in wellbore/well components, measurement, and production of fluids, etc., can solve the problems of short monitoring time of tracers, inability to meet the long-term monitoring requirements of oil and gas wells with flow regulation and water control, etc. The effect of dynamic monitoring time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0110] A foreign oil and gas well with flow control and water control was completed in 2018 with flow control and water screens, which were divided into 5 sections. During the process of flow control and water control screens, oil-soluble tracers and water-soluble tracers were placed in each section. Samples were collected from April 2019 to May 2019, and through laboratory analysis, the output properties and contribution rates of each section of fluid were obtained, as shown in the table below:
[0111]
[0112]
[0113] Any numerical value quoted herein includes all values from the lower value to the upper value in increments of one unit, and there is a separation of at least two units between any lower value and any higher value. Can. For example, if it is stated that a component quantity or process variable (such as temperature, pressure, time, etc.) has a value from 1 to 90, preferably from 20 to 80, more preferably from 30 to 70, the purpose Values such as 15 ...