Emergency regulation and control method for water return gate in accident section of open channel water conveyance project
An emergency control and sluice technology, which is applied in the field of water transfer projects, can solve the problems of multiple times of opening and closing of water sluice gates, and achieve the effect of prolonging the time of a single water withdrawal, improving the efficiency of water withdrawal, and avoiding excessive water withdrawal
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0057] Such as figure 1 As shown, an emergency control method for the retreat sluice of the accident section of the open channel water conveyance project includes the following steps:
[0058] S1. Establish a one-dimensional non-uniform flow simulation model of the channel in the accident section;
[0059] S2. Based on the one-dimensional non-uniform flow simulation model, obtain the pre-accident t 0 The volume of the water body in the accident section at the moment;
[0060] S3. Based on the one-dimensional non-uniform flow simulation model, obtain the post-accident t 1 The volume of the water body in the accident section at the moment;
[0061] S4, according to t 0 moment and t 1 The volume of the water body in the accident section at the moment, and the estimated opening time of the retreat gate is obtained;
[0062] S5. Obtain the water level fluctuation period in the hydraulic transition process;
[0063] S6, monitor the water level at the retreat gate and the wate...
Embodiment 2
[0102] Such as figure 2 As shown, the channel in the accident section includes the upper control gate, the lower control gate and the retreat gate. The enabling water level of the retreat gate is Y max , the closing water level is Y min . Before the accident, the channel water flow is Q(t 0 ), the water level in front of the gate is Y gate (t 0 ). After the accident, the upper and lower control gates are closed in an emergency, and the water delivery flow is reduced to Q(t 1 ). In order to ensure that during the hydraulic transition process, the instantaneous water level at the retreat sluice does not exceed Y max , the water level in front of the gate is stable at Y gate (t 1 ), adopt the following control method of water sluice.
[0103] 1. Establish a one-dimensional non-uniform flow simulation model of the channel in the accident section. Commercial software in the water conservancy industry, such as HEC-RAS, Mike 11, etc. can be used, and languages such as ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com