The airport pavement structure and pavement method of adding asphalt layer to the old cement airport runway
An airport runway, old cement technology, applied to the coagulation pavement, roads, roads and other directions paved on site, can solve the problems of low temperature brittle fracture, high strength, poor coordination, etc., to improve friction and adhesion, reduce effect, good water stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Such as figure 1 As shown, the airport pavement structure of the old cement airport runway of the present embodiment with an asphalt layer, including a lower viscoelastic bonding layer 2, a mortar layer 3, and a gravel layer arranged on the old cement concrete layer 1 from bottom to top. 4. Modified asphalt concrete overlay layer 5, upper interface bonding layer 6 and epoxy asphalt concrete overlay layer 7; crushed stone layer 4 is embedded between mortar layer 3 and modified asphalt concrete overlay layer 5, modified The permanent asphalt concrete overlay layer 5 and the epoxy asphalt concrete overlay layer 7 are bonded through the upper interface bonding layer 6 .
[0042] The lower viscoelastic bonding layer 2 uses pit interface repairing agent, and the bonding strength of the pit interface repairing agent used in this embodiment is 1.2 MPa.
[0043] The mortar layer 3 adopts cement-emulsified asphalt mortar. In this embodiment, the ratio of raw materials used in th...
Embodiment 2
[0068] The airport pavement structure of the used old cement airport runway overlay asphalt layer in embodiment 2, except that the aggregate gradation of the early strength type epoxy asphalt concrete EA-13 of the epoxy asphalt concrete overlay layer 7 is different from that of embodiment 1 Except, the preparation of all the other materials and the paving method are all the same as in Example 1.
[0069] In this embodiment, the aggregate gradation of the early-strength epoxy asphalt concrete EA-13 of the epoxy asphalt concrete overlay layer 7 is shown in Table 3.
Embodiment 3
[0071] The used airport pavement structure of the old cement airport runway overlay asphalt layer used in embodiment 3, except that the aggregate gradation of the early strength type epoxy asphalt concrete EA-13 of the epoxy asphalt concrete overlay layer 7 is different from that of embodiment 1 Except, the preparation of all the other materials and the paving method are all the same as in Example 1.
[0072] In this embodiment, the aggregate gradation of the early-strength epoxy asphalt concrete EA-13 of the epoxy asphalt concrete overlay layer 7 is shown in Table 3.
[0073] Table 3 Aggregate gradation of early strength epoxy asphalt concrete EA-13 in the example
[0074]
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com