Construction method for underneath passing of three-hole highway tunnel through existing railway
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- 赵红刚
- Publication Date
- 2021-11-30
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of tunnel engineering construction, in particular to a construction method for a three-hole highway tunnel passing under an existing railway. Background technique
[0002] The existing method to reduce the construction settlement and disturbance of the existing operating track is: chemical grouting reinforcement stratum method, that is, to carry out grouting reinforcement in advance on the existing railway subgrade stratum and the stratum within a certain range below to improve the soil quality. parameters, so as to reduce the construction settlement and disturbance caused by tunnels and other buildings passing under or adjacent to the construction process. However, the grouting reinforcement method has many disadvantages: First, the grouting reinforcement construction itself will cause disturbance and settlement to the existing subgrade, especially in the loess area, where the collapsibility of the loess is...