Cargo-based resource management method and device, and medium
A resource management and goods technology, applied in the field of goods-based resource management, can solve problems such as inaccurate calculation of goods agent management value, inaccurate calculation of resource allocation quota, fraudulent merchant warehouse receipts, etc., to solve manual multi-scenario intervention, The effect of improving resource utilization
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0064] The embodiment of the present invention provides a resource management method based on goods, such as figure 1 As shown, the method may include:
[0065] Receive a cargo agent management request and a resource allocation request submitted by a merchant, the merchant owns at least one cargo warehouse, and the cargo agent management request is a warehouse agent management request for at least one designated warehouse;
[0066] Sending a cargo collection instruction to the collection equipment in the designated warehouse;
[0067] Receive the goods collection data returned by the collection equipment, including at least one of the following: uniform code, quality, quantity, unit price, warehouse;
[0068] Calculate the merchant's resource allocation quota based on the received collection data through the quota algorithm model.
[0069] The embodiment of the present invention can solve the risk problems of fraudulent merchants' warehouse receipts, counterfeit goods, infor...
Embodiment 2
[0071] The embodiment of the present invention provides a resource management method based on goods, such as figure 2 As shown, the method may include:
[0072] Step S1, sending a goods collection instruction to the collection equipment of the designated warehouse; receiving the goods collection data returned by the collection equipment, including at least one of the following: uniform code, quality, quantity, unit price, and warehouse.
[0073] Specifically, the implementation process of step S1 may include:
[0074] The merchant puts the goods into the warehouses of various places, and the goods monitoring device receives the goods' warehousing information in real time and stores them in a unified center. The main elements of storage include the unified code, quality, quantity, unit price, warehouse, etc. of the goods; the collection equipment stores the elements Collect and send.
[0075] Step S2, before calculating the merchant's resource allocatable quota for the recei...
Embodiment 3
[0154] The present invention provides a cargo-based resource management device, such as Figure 7 As shown, it includes a memory, a processor, and a computer program that is stored on the memory and can run on the processor. When the processor executes the computer program, the method for managing resources based on goods can be realized. The processor includes a goods monitoring module, a data notification module, and a resource Assign modules.
[0155] In this embodiment, the cargo monitoring module can be composed of a handheld terminal, a camera, various sensors, a conveyor belt, and a server. The information such as the quality, quantity, unit price, and warehouse location of the goods is physically stored; the data notification module is mainly composed of a cluster + encryption machine server deployed by the RPC framework, and the module is a bridge between the goods monitoring module and the resource allocation module. Responsible for data exchange between modules to ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


