Project cost work order database automatic matching method and system
A project cost and automatic matching technology, applied in other database retrieval, other database index, other database query, etc., can solve the problems of different project cost costs and difficulty in guaranteeing the accuracy of project cost.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043] The following is attached Figure 1-3 The application is described in further detail.
[0044] The embodiment of the present application discloses an automatic matching method for engineering cost work order database, see figure 1 , the method includes the following steps:
[0045] S100: Obtain historical cost achievement data and establish a standard working model based on the data.
[0046]In this embodiment, the historical cost achievement data refers to the historical engineering project data that has completed construction and accounting. Index, labor cost consumption and price, material consumption and price, machinery consumption and price, management fee and profit index and other related information and other data related to the construction of the project. The standard work model refers to the design and optimization of a series of factors such as a certain type of work process, method, management action, control requirements, etc., to program complex and s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com