Shield tunneling construction method for water-containing sandy gravel layer to penetrate through a cultural relic protection area underneath
A construction method and technology of pebble layer, applied in the field of shield tunnel construction, can solve problems such as excessive stratum deformation, house cracking, settlement lag and suddenness, etc., to ensure safety, avoid adverse effects and avoid adverse effects. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0028] see Figure 1 to Figure 3 , the present invention provides a technical solution: a shield excavation construction method for passing through a cultural relic protection area under a water-containing sand and pebble layer, the construction method includes the following steps:
[0029] S1: Conduct on-site research first;
[0030] S2: Carry out in-depth research on the engineering geological characteristics of rock and soil in the sandy pebble layer;
[...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap