Jacking construction method for thin-earthing small-clear-distance multi-line parallel large-diameter slurry balance pipeline
A mud-water balance and construction method technology, applied in pipeline laying and maintenance, pipes/pipe joints/fittings, mechanical equipment, etc., can solve problems such as difficulty in meeting relevant requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0020] A clear and complete description will be made below in conjunction with technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0021] The jacking construction method of the multi-line parallel large-diameter mud-water balance pipeline with thin covering soil and small clear distance includes the following steps:
[0022] (1) Preparation before jacking:
[0023] During the construction, construct the reaction wall according to the specifications and materials determined by the design, install the reaction dispersing frame, and install the positioning track in the working well according to the actual three-dimensional space position, as the i...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More