Comprehensive reinforcing structure of active-service T-beam bridge and construction method
A technology for strengthening structures and girder bridges, which is applied in bridge reinforcement, bridge construction, etc. It can solve problems such as unsatisfactory reinforcement effects, low construction efficiency, and limited construction space, so as to improve drilling accuracy and efficiency and speed up pouring Improve construction efficiency and improve drilling quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] The comprehensive reinforcement structure of the T-beam bridge in active service includes a support-separated fast enclosure and closed grouting device, a drilling auxiliary device, a prestressed carbon fiber plate installation and a temporary steel plate fixing device, and a precise control frame for the drilling depth of the bridge deck pavement and planting bars and non-leakage steel fiber concrete pouring mold;
[0046] Such as figure 1 As shown, a support-separated fast enclosure and closed grouting device mainly includes welding hinges, semi-cylindrical steel plates, strip-shaped steel plates, bolts, nuts, bolt holes, built-in sealing rubber rings, etc., the semi-cylindrical One end of the steel plate 2 is fixedly connected by the welding hinge 1, and the other end is welded to the elongated steel plate 3. The elongated steel plate 3 is provided with a bolt hole 6, and the first bolt 4 is fixed with the nut 5 through the first bolt hole 6 to make the semi-cylindri...
Embodiment 2
[0052] The present invention also provides a construction method for an active T-beam bridge comprehensive reinforcement structure, comprising the following steps:
[0053] (1) Support reinforcement construction: Before construction, clean up the surroundings of the T-beam supports that need to be grouted. , prefabricated mortar, closed the target support with a separated support fast enclosing grouting device, and inserted a built-in sealing rubber ring 7 at the joint between the lower edge of the support and the device, and passed the first bolt 4 through the first bolt hole 6. Tighten the nut 5 to close the device. After the installation of the device is completed, pour the prefabricated mortar into the gap between the interior of the device and the support through the grouting machine. After the grouting is completed and the curing period is reached, the device is removed.
[0054] (2) Drilling accuracy control: when drilling the T-beam web, place the drilling auxiliary de...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


