Construction method of inspection pit steel stand column track supporting system
A technology of track support and construction method, which is applied in the directions of track, track laying, track maintenance, etc., can solve the problem of the verticality of the cast-in-place concrete small column, the difficulty of controlling the pre-embedding accuracy of the track fixture on the top elevation, and the large amount of secondary reverse transportation. And other issues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0018] A construction method for inspection pit steel column rail support system, refer to Figure 1-4 , including the following steps:
[0019] S1. Positioning and setting out of track bed steel columns: After the construction of track bed cap cushion layer 1 is completed, according to the position of ballast bed steel columns in the drawing, snap wires to position at the corresponding parts of the cushion;
[0020] S2. Pre-embedding of high-strength bolts in track bed steel columns: if figure 2 As shown, after the tying of the foundation cap 2 of the track bed is completed, M16 high-strength bolts 3 are pre-embedded, and two M16 high-strength bolts 3 are pre-embedded in each steel column 4. 20 connection and fixation to ensure that the upper part of the M16 high-strength bolt 3 is fixed, and the lower part of the M16 high-strength bolt 3 is fixed by ¢6 steel bars 6 spot welding to ensure that the M16 high-strength bolt 3 is fixed as a whole; among them, the M16 high-streng...