Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Building engineering project cost evaluation management method and device based on BIM building model, and storage medium

An architectural model and construction engineering technology, applied in data processing applications, design optimization/simulation, special data processing applications, etc., can solve the requirements of different material properties, reduce the accuracy of cost evaluation, and reduce the cost evaluation level of prefabricated construction projects, etc. problems, to avoid working time and energy, improve the accuracy of cost assessment, and reduce the workload of assessment

Pending Publication Date: 2022-05-10
武汉望曦龙辰建筑劳务有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 1. The existing prefabricated construction project cost evaluation method basically adopts personnel evaluation, that is, the cost personnel carry out the project cost according to the architectural drawing data, which not only leads to a large workload of the cost personnel's evaluation, but also occupies a lot of working time and energy of the cost personnel. Moreover, there is a problem that the cost evaluation error of the prefabricated construction project is relatively large, thereby reducing the cost evaluation level of the prefabricated construction project;
[0005] 2. The existing cost evaluation methods of prefabricated construction projects are all based on the unit price of the same type of construction materials. There is a problem that some basic functional areas in the building have different requirements for material properties, which leads to accurate cost evaluation of prefabricated construction projects. The degree is reduced, which affects the rationality and scientificity of the cost evaluation of prefabricated construction projects;

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building engineering project cost evaluation management method and device based on BIM building model, and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0032] see figure 1 Shown, the first aspect of the present invention provides a kind of construction project cost evaluation management method based on BIM building model, comprises the following steps:

[0033] S1. Acquisition of BIM architectural models: obtain the BIM architectural models designed in the prefabricated construction project separately, and sequentially number them according to the set order.

[0034] In this embodiment, the step S1 includes count...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a BIM building model-based construction engineering project cost evaluation management method and device and a storage medium, and the method comprises the steps: obtaining each BIM building model designed in a prefabricated construction engineering project, screening building materials of various properties needed by the construction of each second-level sub-region in each first-level region in each BIM building model, and carrying out the construction of each second-level sub-region in each second-level sub-region in each BIM building model; meanwhile, the set use material volume of each second-level sub-region in each first-level region in each BIM building model is obtained, the unit volume use amount of each property building material required by construction of each second-level sub-region in each first-level region in each BIM building model is obtained, and the actual use material cost of each second-level sub-region in each first-level region in each BIM building model is analyzed; and the estimated comprehensive cost of each BIM building model in the fabricated building engineering project is calculated, and the BIM building model with the lowest comprehensive cost is screened for project construction, so that the fabricated building engineering cost assessment level is improved, and the rationality and scientificity of engineering cost assessment are ensured.

Description

technical field [0001] The invention relates to the field of construction project cost evaluation, and relates to a construction project cost evaluation management method, equipment and storage medium based on a BIM building model. Background technique [0002] With the gradual promotion of BIM technology in construction engineering, more and more construction units have begun to use this technology, and it has become the development trend of building informationization. Adding the BIM model to the prefabricated construction project to assist in the management of the project cost can make the data statistics more intuitive and convenient. [0003] At present, the existing prefabricated construction project cost evaluation methods generally have the following deficiencies: [0004] 1. The existing prefabricated construction project cost evaluation method basically adopts personnel evaluation, that is, the cost personnel carry out the project cost according to the architectur...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q30/02G06Q50/08G06F30/20
CPCG06Q30/0283G06Q50/08G06F30/20
Inventor 杜中望
Owner 武汉望曦龙辰建筑劳务有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products