This application relates to a method,
system, equipment, and medium for assessing
adaptation and modification costs. The method identifies objects to be adapted through
demand analysis and generates an object set. Based on
adaptation point counting rules, the unadjusted scale is quantified, and after adjustment using demand change factors, the adapted scale is obtained. Subsequently, basic
workload is calculated using productivity
benchmark data, and the non-adapted construction
workload is summarized to form the total basic
workload. Then, the corrected workload is obtained through dynamic correction using preset adjustment factors. Finally, based on the corrected workload, labor costs, and allocation rules, the
system calculates and summarizes various costs to arrive at the total cost. This process realizes a shift from subjective experience-based judgment to standardized assessment driven by rules and data, improving the objectivity, accuracy, and adaptability to project dynamics in
cost assessment, and providing a reliable basis for budget control and
resource allocation.