Method, device and equipment for determining predicted output time of task node

A technology of task nodes and output time, applied in the computer field, can solve problems such as lack of rationality and high labor costs

Active Publication Date: 2022-05-17
BEIJING VOLCANO ENGINE TECH CO LTD
View PDF11 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This method is labor-intensive and the results obtained may not be reasonable

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method, device and equipment for determining predicted output time of task node
  • Method, device and equipment for determining predicted output time of task node
  • Method, device and equipment for determining predicted output time of task node

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach

[0069]In a possible implementation manner, each task node in the original link may have only one upstream node, and there is a time interval between the task nodes in the original link. Based on this, the embodiment of the present application provides a specific implementation manner of converting the original link into at least one ideal state link, including:

[0070] A1: If each task node in the original link has only one upstream task node, and there is a time interval between the task nodes in the original link, determine the original link as the path to be processed.

[0071] If each task node in the original link has only one upstream task node, it means that there is no parallel execution link in the original link. At this time, if there is a time interval between the task nodes in the original link, the original link is determined as the path to be processed.

[0072] For example, see Figure 4a , Figure 4a Another schematic diagram for determining the expected ou...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The embodiment of the invention discloses a method, device and equipment for determining predicted output time of task nodes, an original link is converted into at least one ideal state link, and no time interval exists between the task nodes included in the ideal state link. A first time interval exists between the end time of the last task node of the ideal state link and the predicted output time corresponding to the last task node of the ideal state link. And multiplying the ratio of the running time of the target task node to the total running time of each task node included in the ideal state link by the first time interval to determine the buffer time of the target task node. The target task node is each task node included in the ideal state link. And according to the running time and the buffer time of each task node in the ideal state link, determining the predicted output time corresponding to each task node. Therefore, the labor cost is saved, and the determined predicted output time of each task node is more reasonable.

Description

technical field [0001] The present application relates to the field of computer technology, in particular to a method, device and equipment for determining the expected output time of task nodes. Background technique [0002] Each task node in the full link needs to complete its corresponding task. According to the flow direction of tasks in the link, the task nodes can be divided into upstream task nodes and downstream task nodes. After the task of the upstream task node is completed, the downstream task node will be triggered to execute the task. [0003] In the whole link governance work, the user needs to determine the expected output time point of each task node in the whole link, that is, the time point for completing the task promised to the outside world. Furthermore, each task node of the link needs to complete its respective tasks at or before the expected output time point, so as to ensure that the upstream and downstream tasks are successfully completed on time....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F9/48G06F9/54
CPCG06F9/4843G06F9/544
Inventor 刘佳罗旋
Owner BEIJING VOLCANO ENGINE TECH CO LTD