Construction area unloading point utilization grade evaluation method based on refined traffic management
A technology of grade evaluation and construction area, applied in data processing applications, special data processing applications, design optimization/simulation, etc. Analysis and evaluation, inability to reflect nonlinear effects, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0073] The present invention will be further described below according to specific examples of the present invention and in conjunction with the accompanying drawings.
[0074] In one embodiment, a method for evaluating the utilization level of unloading points in construction areas based on refined traffic management is provided, such as figure 1 As shown, the method includes the following steps:
[0075] (A) According to the existing spatial information and usage of each unloading point in the construction area, establish a time-space distribution table of unloading points in the construction area;
[0076] (B) Calculate the time saturation of each unloading point, and calculate its utilization index according to the time saturation;
[0077] (C) Determine the time saturation and time utilization index of each building respectively, calculate the time-saturated space saturation and time-space utilization index of each building according to the space saturation, and determin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com