Method for determining runway lawn slope impact-resistance
A technology of anti-scour performance and turf, which is applied in the field of measuring the anti-scour performance of river turf slope protection, which can solve the problems of complex similarity law and other problems.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0084] For the determination of the anti-scour performance of turf slope protection, 16 groups of turf planted in paddy soil with a growth period of 1.5 months, 2.5 months, and 4.0 months were selected, including 8 groups of natural turf and 8 groups of three-dimensional vegetation net reinforced turf. The measured design pressurized maximum velocity water flow is 4.0m / s, 4.5m / s, 5.0m / s, and the submersion duration is 6h, 12h, 24h, 48h respectively.
[0085] When scouring, the flow velocity of the pressurized high-velocity flow is quickly loaded step by step from 1.0m / s to 5.0m / s with an increase of 0.5m / s, and the head loss in the vegetation area at each level of flow velocity is measured to calculate Bed shear stress values at various flow velocities, and the test results are plotted on image 3 , to obtain the relationship curve between bed shear stress and flow velocity in the vegetation area.
[0086] After the design flow rate is reached, the flushing duration timer i...
Embodiment 2
[0094] For the determination of the anti-scour performance of turf slope protection, 12 groups of turf planted in red soil with a growth period of 1.5 months, 2.5 months, and 4.0 months were selected, and the submersion duration was 6h, 12h, 24h, and 48h. 6 groups of reinforced turf. The flow velocity of the designed pressurized high flow velocity is 2.0m / s, 2.5m / s, 3.0m / s respectively.
[0095] When measuring, the flow rate is quickly loaded step by step from 1.0m / s to 3.0m / s with an increase of 0.5m / s, and the head loss in the vegetation area at each level of flow rate is recorded, so as to calculate the bed at each level of flow rate. surface shear stress value, and plot the result on Figure 5 , to obtain the relationship curve between bed shear stress and flow velocity in the vegetation area.
[0096] After the design flow rate is reached, the flushing duration timer is started, and the head loss is measured at intervals of 0.5 h, and the shear stress value of the bed s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 