Method for determining start time of complementary channel
A technology of start time and channel, applied in the field of high-speed packet data service, can solve the problem of large delay range of Abis port, and achieve the effect of improving speed, reducing delay and channel resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] The method of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0017] Different base station systems and different wireless environments have different air delays, especially for systems with different transmission modes at the Abis interface, the air delays are even more different. The start time of the supplementary channel calculated by the base station system for the mobile terminal should minimize the assignment delay of the supplementary channel and the loss of channel resources and throughput, and maximize the speed of data burst response. This requires that the starting time of the supplementary channel calculated by the base station satisfies the maximum requirement for the mobile terminal to begin demodulation of the supplementary channel immediately after receiving the extended supplementary channel assignment message ESCAM from the base station system.
[0018] The technical scheme of the present invent...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 