Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

20results about How to "Improve collaboration" patented technology

Distributed graphical program development platform based on lightweight reconstruction mechanism

InactiveCN119668597AImprove debugging efficiencysave compilation timeVisual/graphical programmingSoftware reuseSoftware engineeringDistributed development
A distributed graphical program development platform based on a lightweight reconstruction mechanism relates to the technical field of computers and comprises an upper computer and a lower computer. The upper computer comprises an equipment manager component, a development platform main body and a server which are mutually independent; wherein the equipment manager component is used for interacting field equipment and data information with the lower computer; the development platform main body is used for designing, managing, compiling and running a graphical program; the server provides role authentication, program version uploading / downloading of distributed development management and shared variable transfer functions for a user based on a C / S architecture; the lower computer comprises an Agent system service and is connected with the equipment manager component; the development platform can improve the program debugging and deployment efficiency.
Owner:NUCLEAR POWER INSTITUTE OF CHINA

Novel fire rescue cabinet

ActiveCN224085876UWill not encroachAvoid rescue delaysFire rescueMarine engineeringStructural engineering
The utility model discloses a novel fire rescue cabinet, and relates to the technical field of fire fighting equipment, and the scheme is that the novel fire rescue cabinet comprises a fire fighting cabinet body, and a cabinet door mounting opening is formed in the fire fighting cabinet body; the two guide rails are arranged oppositely, and the two guide rails are assembled on the two opposite sides of the cabinet door mounting opening respectively; the cabinet door assembly comprises a first folding plate, a second folding plate and two oppositely-arranged sliding blocks, and one end of the first folding plate is rotationally connected with the top ends of the two guide rails; the two sliding blocks are assembled in the two guide rails in a sliding mode correspondingly, and the sliding blocks can slide in the extending direction of the guide rails in a reciprocating mode. One end of the second folding plate is rotationally connected with the first folding plate, and the other end of the second folding plate is rotationally connected with the two sliding blocks respectively; by means of the unique vertical opening and closing design, the surrounding space of the cabinet body is prevented from being occupied after the cabinet door is opened, a lifesaving channel is kept smooth all the time, and the taking efficiency of fire fighting equipment is greatly improved.
Owner:SICHUAN CHENGFENGDA TECHNOLOGY CO LTD

A collaborative robot dual-machine-tool automation loading and unloading device

ActiveCN224615812Uquick putaccurate placement
This utility model belongs to the field of collaborative robot loading and unloading technology, and discloses a collaborative robot dual-machine tool automated loading and unloading device, including a grinding machine and a lathe. An integrated cabinet is arranged between the grinding machine and the lathe. The integrated cabinet includes a control cabinet, a robotic arm, and a mounting cabinet. The control cabinet and the robotic arm are fixedly installed on the upper end of the mounting cabinet. The control cabinet is located on one side of the robotic arm. A control system is set in the mounting cabinet for controlling the loading and unloading of the robotic arm. The control system controls the robotic arm to automatically complete the loading and unloading operations, quickly and accurately placing the workpiece into the designated position and removing it in a timely manner after processing, shortening the loading and unloading time and reducing downtime. The robotic arm is precisely controlled by the control system to ensure the positional accuracy during the loading and unloading process, avoiding processing quality problems caused by human operation errors.
Owner:SHAANXI FAST AUTO DRIVE GRP CO LTD

A Method and System for Optimizing Joint Logistics Equipment Testing Based on Digital Twin Modeling

This invention provides a method and system for testing and optimizing joint logistics equipment based on digital twin modeling, belonging to the field of digital twin technology. The method includes: collecting multi-source heterogeneous data of the target joint logistics equipment; performing simulation modeling to generate a target twin model; conducting usage correlation analysis to obtain multiple sets of correlated twin models; obtaining a set of operating environment conditions; conducting simulated operation and collecting operating performance datasets for performance deviation analysis to locate the first set of performance bottlenecks; conducting collaborative operation tests on the target twin model and multiple sets of correlated twin models, and identifying performance deviations based on the operating process data to locate the second set of performance bottlenecks; and optimizing the equipment design of the target joint logistics equipment based on the bottleneck integration analysis results. This invention solves the technical problems of existing technologies that rely on limited experimental data, and where test data is often limited to specific environments and lacks comprehensive data coverage across multiple dimensions and scenarios, resulting in poor testing efficiency and accuracy.
Owner:中国人民解放军总医院京南医疗区

A method for dynamic collaborative optimization of off-site computing power based on multi-agent reinforcement learning

ActiveCN121597411BRealize dynamic collaborative optimizationaccurately reflect statusResource allocationBiological modelsFeature vectorGlobal information
The application discloses a kind of off-site computing power dynamic collaborative optimization methods based on multi-agent reinforcement learning, including the following steps: constructing resource topology diagram;Based on resource topology diagram, get node-level state feature vector and system-level state feature vector;Multi-agent environment is constructed;Local observation, global information and agent action set are input into improved CTDE model, output policy network parameters and value network parameters and construct training batch;Based on training batch, get converged policy network parameters and converged value network parameters;Get execution result;Obtain dynamically updated policy network parameters and dynamically updated value network parameters, realize the dynamic collaborative optimization of task acceptance, resource allocation, task migration, replica start-stop and bandwidth matching.
Owner:WUHU BIG DATA CONSTRUCTION INVESTMENT & OPERATION CO LTD

Engineering Task Collaborative Management and Control System and Method Based on Building Information Modeling

ActiveCN120317609BClear data sourcesconsistent data source
This invention relates to the field of engineering management, specifically to a collaborative management system and method for engineering tasks based on Building Information Modeling (BIM). The system includes a spatial BIM module, an engineering placement module, a task association module, a scheme planning module, and an environmental assessment module. The spatial BIM module is used to construct a BIM model based on spatial modeling. The engineering placement module is used to output engineering scheduling schemes. The task association module is used to establish a multi-objective coordinated scheduling model. The scheme planning module is used to plan the most profitable scheme for execution. The environmental assessment module is used to adjust the scheduling scheme according to environmental changes. This invention can plan engineering scheduling schemes, improve the rationality of task allocation, optimize the sequence of engineering tasks, resource allocation, and schedule arrangement, improve construction efficiency, ensure that projects proceed as planned, and simultaneously reduce the impact of environmental factors on the project, thereby improving project efficiency, quality, and collaboration.
Owner:NANJING RONGZHIDING TECH CO LTD

A method for supporting conversion of an automotive electric machine system architecture model to a simulation model

PendingCN122595471AConfidencespeed up iteration
The present application relates to the technical field of system engineering, and relates to a method for supporting conversion of an automobile motor system architecture model to a simulation model. A domain meta-model library for constructing the automobile motor system architecture model and a template library of Simulink models are acquired. According to a construction requirement of the automobile motor system architecture model, a target automobile motor system architecture model is constructed. Each template corresponding to the target automobile motor system architecture model is determined from the template library as a template set of the target simulation model. According to the attributes of each meta-model contained in the target automobile motor system architecture model, each template in the template set is filled in to generate a target simulation model code according to each filled template, and a target Simulink simulation model is generated according to the target simulation model code. By constructing a mapping relationship between the domain meta-model library and the Simulink template library, automatic conversion of the automobile motor system architecture model to the simulation model is realized.
Owner:CHINA AUTOMOTIVE ENG RES INST

Data lake-oriented external data repair method and device, equipment and storage medium

This application discloses an external data repair method, apparatus, device, and storage medium for data lakes, relating to the fields of financial technology and data engineering technology. The method includes: acquiring scheduling information and reference relationship information of external data in the data lake; determining corresponding downstream protection link information based on the scheduling and reference relationship information; monitoring corresponding data entry start operations and abnormal failure operations based on the downstream protection link information to determine the data entry start operation information and abnormal failure operation information; identifying emergency handling tasks corresponding to the affected downstream operation links based on the data entry start operation information and abnormal failure operation information to determine emergency handling task information; and controlling the system based on the emergency handling task information to update or repair the data in the data lake. This application significantly improves response efficiency and ensures data lake security by accurately identifying affected downstream operation links and automatically generating emergency task control data repair.
Owner:CHINA MERCHANTS BANK

Dual-arm multi-vision collaborative robot 3D dispensing and mounting detection integrated system

The application relates to a 3D dispensing and mounting detection integrated system based on a dual-arm multi-vision cooperative robot, and belongs to the field of intelligent robots; a sensor tooling table is horizontally arranged on the upper surface of a workbench; a sensor detection table is arranged on one side of the sensor tooling table; a detection robot arm position corresponds to the sensor tooling table; a shock absorber tooling table and a chip placement position are adjacently arranged on the upper surface of the workbench; a dispensing robot arm is installed on one side of the shock absorber tooling table; a dispensing device is installed at the top end of the dispensing robot arm; a multi-vision visual assembly and a height sensor position correspond to the dispensing robot arm; a glue cleaning device is installed on one side of the shock absorber tooling table; the application realizes accurate positioning of parts and accurate detection of dispensing effect through the visual assembly, can effectively improve the production speed of products, and guarantees the qualified quality of products; moreover, the system guarantees stable taking and placing of the parts through the mechanical clamps driven by the robot and the air cylinder, realizes steady execution of the overall process, and improves the flexibility and cooperation of assembly.
Owner:BEIJING RES INST OF TELEMETRY +1

Multi-agent near-end strategy optimization method and system based on embedded strategy representation

PendingCN121960638AMitigating strategy homogeneity issuesImprove strategy diversityBiological modelsFeature vectorUndirected graph
The invention provides a multi-agent near-end strategy optimization method and system based on embedded strategy representation. The method comprises the following steps: inputting local observation data of agents into a variational auto-encoder (VAE) for encoding to obtain potential strategy codes; inputting the potential strategy code into a contrast learning framework to obtain a feature vector, and splicing the potential strategy code and the feature vector to obtain discriminative strategy representation; the method comprises the following steps: modeling a multi-agent system into an undirected graph, and inputting the undirected graph into a pre-trained GAT-Transform fusion model to obtain fusion features; and inputting the local observation data and the discriminative strategy representation into an Actor network of an EPR-MAPPO algorithm, inputting the global state data, the local observation data and the fusion features into a Critic network of the EPR-MAPPO algorithm, and outputting action probability distribution of the intelligent agent. According to the method, the cooperation efficiency among the agents in the multi-agent system can be improved, a better strategy can be more quickly converged by adopting the improved algorithm, the training time and resource consumption are reduced, and the overall performance and adaptability of the system are improved.
Owner:WUHAN UNIV OF TECH

Multi-agent cooperative optimization method and system based on multi-terminal training access

ActiveCN121455647BAvoid conflict of intent issuesImprove collaborationProgram initiation/switchingResource allocationResource assignmentDistributed computing
The application relates to the technical field of agent cooperation optimization, and discloses a multi-agent cooperation optimization method and system based on multi-terminal training access, which comprises the following steps: constructing an operation intention vector according to multi-modal training operation data from different terminals; mapping the operation intention vector to a pre-constructed task graph to predict a first computing resource; setting a coupling relationship between each agent and a task in different task roles, calculating the value of an agent combination executing a task sequence, and obtaining a first resource allocation strategy; simulating a task execution process of the agent combination executing the task sequence, optimizing the first resource allocation strategy, and obtaining a second resource allocation strategy; and allocating corresponding computing resources to each agent according to the second resource allocation strategy, and scheduling each agent to execute each task in the task sequence. The application can improve resource utilization, improve agent cooperation performance, and thus improve the quality and efficiency of multi-terminal training.
Owner:BEIJING CHINESE EDUCATION TECH CO LTD

Quickly-assembled anti-slide pile for emergency treatment of side slope landslide

ActiveCN224741603UImprove structural strengthImprove collaboration
The application discloses a quick assembly type anti-slide pile for emergency treatment of slope landslide, and belongs to the technical field of anti-slide piles. The assembly type anti-slide pile comprises a pile body and a first soil protection plate installed on the pile body. An assembly mechanism is arranged on the first soil protection plate. The assembly mechanism comprises two assembly rail seats symmetrically installed on each first soil protection plate. A second soil protection plate is arranged between the assembly rail seats at the edges of every two first soil protection plates. A supporting plate is fixedly installed on the second soil protection plate. The supporting plate is fixedly connected with the second soil protection plate through a reinforcing rod. A plurality of independent anti-slide pile units are transversely connected through the second soil protection plate as a connecting piece. The supporting plate and the reinforcing rod enhance the structural strength of the second soil protection plate. The originally isolated anti-slide piles are mechanically connected to form a continuous and integral anti-slide barrier, so that the cooperative work and overall stability of the anti-slide pile group are greatly improved.
Owner:THE 4TH GEOLOGICAL BRIGADE OF SICHUAN

A multi-agent based method for collaborative multi-point flow prediction of pipe network

This invention discloses a multi-agent-based multi-point flow collaborative prediction method for pipeline networks, comprising the following steps: Step 1: Collecting and preprocessing raw pipeline network data from each node; Step 2: Extracting temporal features from the standard pipeline network dataset through periodicity and trend decomposition; Step 3: Inputting the pipeline network temporal feature vectors into a ResNetV2 network for spatial feature modeling; Step 4: Calculating the Manhattan distance between pipeline network feature vectors to construct a pipeline network feature map; Step 5: Inputting the pipeline network feature map into an improved MADDPG model, and making flow prediction decisions through node encoders, flow trend sharing mechanisms, and dynamic reward mechanisms to obtain the optimal flow prediction strategy; Step 6: Verifying the consistency of the optimal flow prediction strategy and performing trend smoothing. This invention improves the accuracy and collaboration of pipeline network flow prediction through a ResNetV2 network and an improved MADDPG model, achieving intelligent management.
Owner:QINGDAO YIHE XINSHUI TECHNOLOGY CO LTD

Concurrent linkage execution method for intelligent contracts among multiple fragments

PendingCN119645945AImprove collaborationImprove business processing performanceFile access structuresFile/folder operationsEdge computingSmart contract
The invention relates to the technical field of intelligent contract execution in an edge computing scene, in particular to an intelligent contract concurrent linkage execution method among multiple fragments, which comprises the following steps: taking nodes existing in multiple block chain fragments as gateway nodes; the gateway node collects intelligent contract information deployed in the fragment where the gateway node is located and describes the contract information in a contract directory and key value pair form; the gateway node constructs, stores, queries and modifies a smart contract directory by using the MPT; the gateway node uses a broadcast communication technology to carry out security sharing of a contract directory between a plurality of other gateway nodes and the fragments; and a plurality of gateway nodes cooperate to jointly complete concurrent linkage execution of the intelligent contracts among the multiple fragments through contract calling. According to the invention, dynamic perception of the smart contract in the multiple fragments of the block chain by the block chain node is realized, contract service collaboration is allowed to be completed through smart contract linkage execution among the multiple fragments, and the collaboration capability of the multiple nodes of the block chain system and the business processing capability of the smart contract are improved.
Owner:ZHONGYUAN ENGINEERING COLLEGE

A Q-learning-based method for on-orbit maintenance task allocation for multi-robot arms

This invention discloses a multi-robot on-orbit maintenance task allocation method based on Q-learning, comprising the following steps: Step 1, rasterizing the simulated on-orbit maintenance task space into a three-dimensional array model; Step 2, initializing the positions of the end effectors of each robot arm and the positions of multiple target points for maintenance tasks; Step 3, based on the Q-learning algorithm, obtaining the ideal paths for each robot arm that start simultaneously, achieve the optimal time to complete all tasks, and maximize the cooperation among the robots; Step 4, obtaining the task allocation and execution order of each robot arm based on its ideal path. This invention effectively solves the problem of unclear task allocation in multi-robot, multi-target scenarios, improves the cooperation between robots, reduces task completion time, and thus leverages the advantages of multiple robots.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

A hierarchical dynamic scheduling method based on the policy optimization DDQN algorithm

ActiveCN119987302BImprove scheduling abilityEfficient scheduling decision-making processProgramme total factory controlPERQBatch processing
This invention discloses a hierarchical dynamic scheduling method based on the policy optimization DDQN algorithm for solving the dynamic scheduling problem of a reentrant hybrid pipelined workshop with batch processing machines. First, the objective function and constraints of the scheduling problem are determined. Then, by introducing a self-attention mechanism, a hierarchical structure based on DDQN is proposed, constructing two agents: a batching agent and a scheduling agent, to solve the batching and scheduling subproblems respectively. Furthermore, to address the multi-stage batch processing and reentrant scheduling characteristics of the problem, a Markov decision process considering the characteristics of these two agents is designed, including state, action, and reward. Further, an action selection strategy based on masking combined with an ε-greedy strategy and a soft-start target network update strategy are proposed to improve efficiency and generalization ability. This invention demonstrates significant effectiveness in solving the dynamic scheduling problem of a reentrant hybrid pipelined workshop with batch processing machines.
Owner:SOUTHWEST JIAOTONG UNIV

Navigation method, device and storage medium based on temporary communication

This application provides a navigation method, device, and storage medium based on temporary communication. The method includes: when communication with an external base station is unavailable, acquiring a pre-constructed temporary vehicle network topology and receiving the traffic status and relative position of each vehicle node in the temporary vehicle network topology to the current vehicle; determining a first path and a second path based on preset navigation information and the traffic status and relative position of each vehicle node; wherein the path length of the second path is greater than the path length of the first path; driving along the first path, and if at least one vehicle node in the first path has a non-traffic status, driving along the second path. This technical solution achieves the effect of replanning the route when the current vehicle cannot communicate with an external base station, thus avoiding the risk of impassable routes in advance and improving the overall road transport efficiency.
Owner:CHENGDU CELIS TECH CO LTD

A method and device for multi-device collaborative work

ActiveCN115314494BImprove collaborationImprove collaborative work efficiencyConnection managementSubstation equipment
The present application discloses a method and apparatus for multi-device collaborative work, wherein the method includes: the collaborative control device of the collaborative group monitors the application operation and resource usage status of each member device in the group in real time; all devices in the group are in the same local area network; when the first member device needs to start the application operation, the collaborative control device determines whether the operation requires device collaboration, and if so, determines the hardware that needs collaboration based on the resource usage status of the first member device; the collaborative control device matches the hardware that needs collaboration based on the resource usage status of the member devices in the group with the second member device for providing corresponding collaboration; using the virtual bus simulated by the communication link of the local area network, the collaborative request instruction and the operation instruction and data set required for executing the corresponding collaboration are sent to the second member device to trigger the second member device to perform the corresponding collaborative operation. By adopting the present application, many-to-many device collaboration can be realized, and the efficiency of collaborative work can be effectively improved.
Owner:SAMSUNG ELECTRONICS CHINA R&D CENT +1

An energy-saving communication method, device and equipment for a Wi-Fi and BLE combination chip

ActiveCN117858209BImprove power consumption performanceImprove collaboration
A kind of energy-saving communication method, device and equipment for Wi-Fi and BLE combination chip, involve wireless communication technical field, method includes: the BLE module receives external RTS frame data and demodulates, obtains the receiving address field of the RTS frame data Demodulation corresponding BLE receiving address;The BLE address corresponding to the BLE receiving address and the Wi-Fi MAC address corresponding to local Wi-Fi module are compared, if the BLE address is consistent with the BLE receiving address, then wake up the Wi-Fi module to send CTS frame confirmation, and carry out data transmission;After transmission is completed, the Wi-Fi module enters dormancy, and the BLE module continues to listen;The method is fused by RTS / CTS mechanism and the cross-technology communication method based on narrowband decoding, we realize that BLE module assists Wi-Fi module to carry out listening, overcome the barrier and obstacle between different communication protocols of Wi-Fi and BLE, and information exchange from Wi-Fi to BLE is realized.
Owner:HARBIN INST OF TECH

Task flow automatic generation method and device, computer equipment and storage medium

The invention relates to the technical field of multi-model collaboration, and discloses a task process automatic generation method and device, computer equipment and a storage medium, and the method comprises the steps: obtaining multi-modal input information; extracting semantic elements of the multi-modal input information, inputting the semantic elements into a preset story template, and injecting domain knowledge into the story template to output a story framework; performing structured processing and compliance and integrity verification on the story framework; inputting the structured user story which is verified to be qualified into a project management system to generate a final user story; and based on the final user story, updating the knowledge base to form an executable automatic task process. Through structural processing, knowledge enhancement and compliance integrity verification, in combination with an automatic access program and object storage-based knowledge base support, the problems of low efficiency and insufficient automation of traditional manual writing are solved, the compliance and speciality of user stories are guaranteed, and the convenient development requirements in the financial and medical fields are met.
Owner:PING AN TECH (SHENZHEN) CO LTD