Unlock instant, AI-driven research and patent intelligence for your innovation.

Control method for secondary charging of net element equipment based on network management system

A technology of network element equipment and network management system, which is applied in the direction of secondary battery, secondary battery repair/maintenance, circuit, etc., to achieve the effect of flexible setting.

Active Publication Date: 2011-04-20
深圳市中兴通讯技术服务有限责任公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Through patent search and query, there is only one patent on load control device and circuit design, and there is no method to remotely control the secondary power-off and load of each network element device in the system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Control method for secondary charging of net element equipment based on network management system
  • Control method for secondary charging of net element equipment based on network management system
  • Control method for secondary charging of net element equipment based on network management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] In order to better illustrate the purpose, technical solutions and beneficial effects of the present invention, the present invention will be described in detail below in conjunction with the accompanying drawings, taking the WCDMA wireless base station network management system to set the base station's secondary power-off control strategy as an example:

[0023] 1) The main control board, the monitoring board, and the transmission board that communicates with the wireless network controller are used as the main load, connected to a power supply branch of the battery, and other boards are connected to another power supply of the battery as secondary loads branch.

[0024] 2) if figure 1 As shown, the centralized network management system of the base station can check the power-off control strategy of each network element at any time. When the operation and maintenance personnel need to check the power-off control strategy of each network element, the network management...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a network element equipment second electrification control method which is based on network management; the invention comprises the following steps that 1) two bypaths are set for the power supply of the network element equipment by batteries and the two bypaths are separately used for main load power supply and secondary load power supply; 2) the network management is provided with second electrification control strategies for each network element equipment and the strategies are issued to each network element equipment; 3) power monitoring modules of the network element equipment receive the issued second electrification control strategies to store; 4) as for the network element equipment which needs second electrification, when the power supply of the battery isdegraded to the lower limits of the second electrification control strategies, the power monitoring module cuts off the power supply bypath for the secondary load of the network element equipment. Byadopting the control method of the invention, the network management could set long-distance electrification strategies in batches; when the power supply voltage of the battery declines, the crucial part operation is ensured firstly to provide precious time for gradual exit of services, and the report of important alarm and performance data are ensured.

Description

technical field [0001] The invention relates to a method for controlling network element equipment to perform secondary power-off operation through a network management system, in particular to power supply management of network element equipment in the communication field. Background technique [0002] With the large-scale development of mobile communication construction, the importance of mobile communication power supply is becoming more and more significant. The power supply provides power for the normal operation of network communication equipment, and its stability and reliability are crucial. At present, most mobile network devices provide secondary power-off protection function, which can cut off loads in stages, and can effectively use electric energy to supply power to main loads during power outages, while effectively protecting batteries. [0003] The so-called secondary power-off protection function means that when the voltage at both ends of the battery drops t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H04Q1/28H04M19/00H01M10/42H01M10/00
CPCY02E60/10
Inventor 方亚东
Owner 深圳市中兴通讯技术服务有限责任公司