Riverway water quality purification and ecosystem restoration adjustable wetland technology
An ecological restoration and water purification technology, applied in the field of river water purification, can solve problems such as contradictions in the requirements of river flood control functions, and achieve the effects of maintaining water temperature, restoring river ecology, and improving water quality.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] 1. Construct a water storage 1.5 million m 2 km downstream of the Yi River 3 River-stopping rubber dam with a water surface area of 500,000 m 2 , forming an artificial lake. The total area of construction in the upstream of the rubber dam is 200,000 m 2 Constructed wetlands, plant silk leaf eye vegetables, planting density 20 clumps / m 2 (4 plants / clump). In the flat water season (April-June and September-November), when the hydraulic retention time of the constructed wetland is adjusted for 7-10 days, the average COD content of the wetland inlet is 38.7mg / L, and the average COD content of the wetland outlet is 13.3mg / L. The rate can reach 65.6%. In the dry season (December to March of the following year), when the hydraulic retention time of the constructed wetland is adjusted to 35-45 days, the average COD content of the wetland inlet is 67.7mg / L, and the average COD content of the wetland outlet is 17.1mg / L. Up to 74.7%. It has reached the Class III water qu...
Embodiment 2
[0032] Build a water storage facility with a capacity of 1 million m 1 km downstream of the Dasha River 3 River-stopping rubber dam with a water surface area of 320,000 m 2 , forming an artificial lake. The total area of construction in the upstream of the rubber dam is 150,000 m 2 Constructed wetlands, planting silk leaf eye vegetables, the planting density is 25 clumps / m 2 (4 plants / clump). In the flat water season (April-June and September-November), when the hydraulic retention time of the constructed wetland is adjusted for 8-10 days, the average COD content of the wetland inlet is 37.1mg / L, and the average COD content of the wetland outlet is 15.3mg / L. COD removal The rate can reach 58.8%. In the dry season (December to March of the following year), when the hydraulic retention time of the constructed wetland is adjusted to 35-50 days, the average COD content of the wetland inlet is 65.4mg / L, and the average COD content of the wetland outlet is 16.6mg / L. Up to 7...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com