Foundation treatment method for temporary construction subgrade on dredge fill soft foundation site
A weak foundation and foundation treatment technology, applied to roads, roads, buildings, etc., can solve problems such as laborious, limited strength improvement, and long time consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] Below in conjunction with accompanying drawing and specific embodiment the present invention is described in further detail:
[0017] Depend on figure 1 Visible: the present invention is realized through the following steps:
[0018] 1. Use ordinary standard bamboo boards or rafts;
[0019] 2. According to the planned construction route, continuously lay bamboo slabs or rafts 2 on the dredged fill 1. The bamboo slabs or rafts should be overlapped and connected with steel wires to ensure the effectiveness of the overlap and form a whole raft;
[0020] 3. The length of the standard bamboo slabs or rafts laid continuously shall be determined according to the needs of the walking route, and the width shall be the width of the planned route and extend 0.8-1.2 meters outward to both sides;
[0021] In step 2: For the walking route of large-scale construction machinery, lay bamboo planks or rafts first, and then lay 280-320mm thick ballast or block stones on it, and lay 70-...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com