Method and device for measurement configuration of multi-carrier system
A technology of multi-carrier system and measurement configuration, applied in electrical components, wireless communication, etc., can solve problems such as no measurement configuration solution, achieve the effect of updating and ensuring rationality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0083] This embodiment describes that the network side sends a measurement configuration message for the frequency points where the old and new carriers are located by means of display signaling, and the UE side deletes the original measurement configuration on the frequency points where the two carriers are located, and executes according to the measurement parameters configured on the network side The measurement process at the corresponding frequency point.
[0084] The scenario of this embodiment is as Figure 4 As shown, there are four cells under the base station 1: cell 1, cell 2, cell 3 and cell 4, and the four cells can be aggregated to serve the UE at the same time. Currently, the UE aggregates cell 1 and cell 2 under base station 1 for CA transmission, where cell 1 is the PCC and cell 2 is the SCC.
[0085] The network side subsequently manages the CC set aggregated by the UE according to the measurement report results, instructs the UE to replace cell 2 with cell ...
Embodiment 2
[0087] Similar to Embodiment 1, the network side can use one-to-one replacement when replacing the CC of the UE, and each connection reconfiguration message can contain multiple pairs of CC replacement information, for example:
[0088] cc-ReplaceList SEQUENCE(SIZE(1..maxReplace))OF CC-Replace
[0089] OPTIONAL,
[0090] CC-Replace::=SEQUENCE{
[0091] sourceCell CellInfo;
[0092] targetCell CellInfo;
[0093]}
[0094] Among them, maxReplace indicates the maximum number of CC pairs that can be replaced by one signaling, and CellInfo can be the frequency point and PCI information of the cell, or the cell index (index) information introduced by the RRC layer. In cell replacement, only downlink CCs may be replaced, or both downlink CCs and uplink CCs may be replaced together. Optionally, the network side may issue measurement configuration information for the frequency point where the cell is replaced, or other related configuration information of the two cells may be...
Embodiment 3
[0096] Similar to Embodiment 1, where the network side can replace a group of cells to a group of cells in a connection reconfiguration message when changing the CC of the UE, for example:
[0097]sourceCellList SEQUENCE(SIZE(1..maxReplace))OF CellInfo;
[0098] targetCellList SEQUENCE(SIZE(1..maxReplace))OF CellInfo;
[0099] Wherein, sourceCellList represents the cell list to be replaced, targetCellList represents the cell list after replacement, and CellInfo may be the frequency point and PCI information of the cell, or the cell number (index) information introduced by the RRC layer. In cell replacement, only downlink CCs may be replaced, or both downlink CCs and uplink CCs may be replaced together. Optionally, the network side may issue measurement configuration information for the frequency point where the cell is replaced, or other related configuration information of the two cells may be replaced in the same message.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 