A composite prestressed uplift pile with enlarged head
A technology of expanding head and pulling-resistant piles, applied in sheet pile wall, construction, foundation structure engineering, etc., can solve the problems of reducing the friction between soil and pile, affecting the bearing pressure and tensile strength of piles, and complex production process, and reducing the Concentration of local stress, improving bearing capacity and high precast strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] Such as figure 1 As shown, the present invention includes a cement-soil mixing pile 1, a concrete columnar core 2 in the cement-soil mixing pile 1, and a cap surface 3 arranged at the upper end of the cement-soil mixing pile.
[0018] still as figure 1 As shown, the inner coaxial line of the concrete columnar core 2 is provided with a prestressed steel cable 4 (the steel cable 4 is set concentrically with the columnar core 2), the lower end of the steel cable 4 is provided with a first expansion head 6, and the upper end of the steel cable 4 A tensioned fixed connector 5 is provided, and the upper end of the steel cable and its connector 5 are located on the platform. In this embodiment the connectors are anchor clamps.
[0019] still as figure 1 As shown, the first enlarged head 6 is a concrete prefabricated part, and the concrete prefabricated part is provided with a hole, and the lower end of the prestressed steel cable 4 passes through the hole and is connected a...
Embodiment 2
[0023] Such as figure 2 As shown, the lower end of the prestressed steel rope 4 is provided with two expansion heads (the first expansion head 6 and the second expansion head 9) sequentially from bottom to top. Preparation process: pass the steel cable through the vibrating pipe from bottom to top, then put the vibrating pipe into the cement-soil mixing pile, withdraw the pipe upward while vibrating, pour concrete into the pipe at the same time, and then use a hammer to Hit the bottom to make the concrete bulge around, thus forming the second enlarged head. All the other implementations are as in Example 1.