Method and system for managing central air-conditioning end equipment of teaching building based on schedule
A technology of central air-conditioning and terminal equipment, which is applied in the field of management of central air-conditioning terminal equipment in teaching buildings based on schedules, and can solve problems such as energy waste
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0072] In this embodiment, a method for managing central air-conditioning terminal equipment in a teaching building based on a schedule, such as figure 1 shown, including the following steps:
[0073](1) Set and store the detailed information of each classroom in the teaching building in the remote server, including classroom name, location, area, schedule, capacity, communication address of the air-conditioning equipment node in the classroom, and terminal air-conditioning equipment control area , the unmanned image of each classroom, the set scanning cycle, the attendance rate interval of non-class classrooms (ε 1 , ε 2 ), the regional occupancy rate μ in non-class classrooms, the opening coefficient δ of non-class classrooms on each floor, and the air-conditioning pre-start time a before class; where, the schedule is the daily schedule of the classroom, including the start time and end time of the course and other information.
[0074] (2) The remote server distinguishes...
Embodiment 2
[0114] In this embodiment, a calendar-based central air-conditioning terminal equipment management system for teaching buildings has a structure such as Figure 10 As shown, compared with Embodiment 1, the difference is that the air-conditioning node device groups in each area and the remote server use power lines to transmit control data (that is, the on-site control network is a power line network), and the data conversion module uses i.LON 100 modules, such as Figure 11 As shown, the number 1 in the figure is the Ethernet port, and the number 2 is the Ethernet cable.
[0115] In this embodiment, the terminal equipment of the central air conditioner includes a fan coil unit, an air conditioner, and a fresh air fan.
[0116] In this embodiment, the air conditioner node device may also be one of an independent fan coil node device, a fan coil node device integrated with a thermostat, an air conditioner node device or a fresh fan node device.
[0117] Such as Figure 12 As ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com