Modeling method and simulation method for monitoring signals in electric power dispatching simulation training system

A technology of simulation training system and monitoring signal, applied in the field of modeling and simulation of monitoring signal of power dispatching simulation training system, can solve the problem that the monitoring signal of secondary equipment cannot be simulated in the true sense, affecting the training simulation effect and scheduling. It solves the problems of reducing the fidelity of personnel simulation training, so as to achieve the effect of realism and reducibility, and improve the effect of actual combat.

Active Publication Date: 2013-05-08
STATE GRID CORP OF CHINA +3
View PDF5 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] We know that there are primary equipment and secondary equipment in the power grid system. In a real power grid dispatching system, primary equipment includes lines, buses, loads, generators, transformers, switches, circuit breakers, capacitors, reactors, etc., The monitoring signals generated by these primary equipment failures are relatively easy to simulate, but the secondary equipment monitoring signals generated by secondary equipment such as current transformers and voltage transformers are mainly due to the alarm or alarm generated by the secondary equipment triggered when the primary equipment of the power grid is abnormal or faulty. Action signals and monitoring signals of secondary equipment often cannot be simulated in the true sense in the simulation system
Therefore, in the existing simulation training process, if the monitoring signal of the secondary equipment as an important reference is not simulated correctly or is not real, the fidelity of the dispatcher simulation training will be greatly reduced, which will affect the actual training simulation effect

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Modeling method and simulation method for monitoring signals in electric power dispatching simulation training system
  • Modeling method and simulation method for monitoring signals in electric power dispatching simulation training system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The present invention will be specifically introduced below in conjunction with the accompanying drawings and specific embodiments.

[0027] refer to figure 1 As shown, the modeling method of the monitoring signal in the power dispatching simulation training system of the present invention comprises the following steps:

[0028] Step a: Choose an actual power grid as the basis and reference for modeling, pack and process all the equipment, faults, and monitoring signal related information in the power grid dispatching system of the power grid to form data related to faults and monitoring signals The fault data unit and the monitoring signal data unit correspond to each other one by one, and then the fault data unit and the monitoring signal data unit are collected to form a total data resource library.

[0029] Generally speaking, for the general power grid dispatching system, due to the needs of daily work, information about equipment, faults, and monitoring signals h...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a modeling method and a simulation method for monitoring signals in an electric power dispatching simulation training system. The modeling method comprises the following steps of: performing data processing on all equipment, faults and monitoring signals in the conventional power grid dispatching system serving as a model to form fault data units and monitoring signal data units which are in one-to-one correspondence to the faults and the monitoring signals; counting, arranging and classifying the fault data units and the monitoring signal data units to form a fault data repository and an unlabelled monitoring signal data repository; matching the monitoring signal data units in the monitoring signal data repository with the fault data units in the fault data repository by using equipment information as the corresponding standard; and marking a trigger label to be searched and screened and the like on each monitoring signal data unit. The modeling method and the simulation method have the advantages that secondary equipment monitoring signals can be effectively simulated, the simulation authenticity and recoverability of power grid monitoring signals are achieved to the greatest extent, and an actual effect of simulation training is greatly improved.

Description

technical field [0001] The invention relates to a modeling method and a simulation method of a simulation training system, in particular to a modeling method and a simulation method of a monitoring signal of a power dispatching simulation training system. Background technique [0002] The power dispatching simulation training system is to cultivate the dispatcher's ability to grasp the overall operation status of the power grid and the ability to respond to and correctly handle power grid emergencies in a timely manner. It is a very important training system. [0003] We know that there are primary equipment and secondary equipment in the power grid system. In a real power grid dispatching system, primary equipment includes lines, buses, loads, generators, transformers, switches, circuit breakers, capacitors, reactors, etc., The monitoring signals generated by these primary equipment failures are relatively easy to simulate, but the secondary equipment monitoring signals ge...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50G09B9/00
Inventor 张文斌刘健戴则梅谢旭江长明牛四清罗亚洲张哲黄河清栗向鑫施磊周煜李雷尚润田王梅
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products