Control method for intelligent load controller for power distribution branches
A control method and controller technology, applied in sequence/logic controller program control, electrical program control and other directions, can solve the problems of inability to complete load and current matching judgment, evaluation, and inability to realize student power distribution control technology, etc. To achieve the effect of good training economic benefits and strong practicability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] An intelligent load controller for distribution branches, including a control center, a power supply unit, a drive unit, an execution unit, a data input controller, an alarm and a display unit (see figure 1 shown in the block diagram), where,
[0041] The control center is a Siemens PLC control center, which is used to command, coordinate, organize and control the components, and receive and judge the distribution branch data input by the data input controller, and decide whether to connect the power distribution branch power supply;
[0042] Described power supply unit is used for providing power supply for PLC control center, and the output end of this power supply unit is connected with the input end of PLC control center;
[0043] The drive unit is used to amplify the control signal output by the PLC control center to drive the execution unit to execute the instructions output by the PLC control center. The input end of the drive unit is connected to the output end...
Embodiment 2
[0048] This method is to input the power of the electric load and the rated current value of the distribution branch circuit calculated according to the power, and the PLC control center judges whether the power of the electric load matches the calculated rated current value of the distribution branch circuit, and decides Whether to connect the power distribution branch, so as to realize the simulation selection training of the wires and switchgear of the power supply and distribution system; the method includes the following steps:
[0049] S1. The power input to the load;
[0050] S2. Determine whether the input is complete, if yes, enter step S3, if no, repeat step S1;
[0051] S3. Input the rated current value of the distribution branch circuit that matches the power of the electric load;
[0052] S4. Determine whether the input is complete, if yes, then enter step S5, if no, then repeat step S3;
[0053] S5. Judging whether the input load power matches the calculated...