Electric hoist controller used on PLC (programmable logic controller) control line
A controller and hoist technology, applied in the direction of the spring mechanism, hoisting device, etc., can solve the problems of not configuring the travel switch, damage to the hoist parts, hoist topping, etc., so as to avoid the hoist topping, run stably, and reduce maintenance costs. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0009] Such as figure 1 As shown, the controller includes an AC contactor 1, a transformer 2, a reverse phase protector 3 and a limit switch 4. The main power line is connected to one end of the AC contactor 1, the transformer 2 is connected to the main power line, and the other end of the transformer 2 One is connected to K2 of reverse phase protector 3, the other end of transformer 2 is connected to A1 of AC contactor coil 1, K0 and K1 of reverse phase protector 3 are respectively connected to limit switch 4 of the hoist, the limit The bit switch 4 is connected with the coil A2 of the AC contactor 1 to form a controller electrical circuit as a whole.
[0010] When working, the hoist motor line is connected to the AC contactor 1. When the hoist works to the upper limit position, the electrical circuit of the controller is disconnected, and the AC contactor 1 stops working, and the same is true for the lower limit position.
PUM