Method for load dump test of gas turbine
A technology of gas turbine and test method, which is applied in gas turbine engine test, jet engine test and other directions, can solve the problem of no test method, etc., and achieve the effect of shortening time, improving safety and ensuring safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0024] A gas turbine load rejection test method utilizes a hydraulic dynamometer as the load of the gas turbine, comprising the steps of:
[0025] (1) After the gas turbine has completed the run-in test and inspection test run, the gas turbine performance acquisition test is carried out at the same time as the gas turbine load rejection test; the gas turbine is started to run, when the output power of the gas turbine reaches its rated output 10% of the power (7200KW), that is, 720KW, when the power swing of the hydraulic dynamometer does not exceed 3% of 720KW, record the position of the water inlet valve and drain valve of the hydraulic dynamometer, and put the hydraulic dynamometer The load control valve position of the dynamometer is set to 0.1 working condition; when the output power of the gas turbine reaches 1440KW, and the power swing of the hydraulic dynamometer does not exceed 3% of the 1440KW of the gas turbine, record the hydraulic dynamometer The water inlet valve ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com