A kind of optical fiber Bragg grating dynamic anemometer and using method thereof
An anemometer and optical fiber technology, applied in instruments, fluid velocity measurement, indication/recording actions, etc., can solve the problems of unable to monitor the wind direction of the wind field
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Embodiment 1: as Figure 1-4 As shown, a fiber Bragg grating dynamic anemometer, including impeller 1, impeller shaft 2, speed cam 3, vane shaft 4, empennage 5, bearing 6, fastening screw 7, direction cam 8, fiber Bragg grating 9, etc. Strength cantilever beam 10, base 11, angle cam 12; the impeller 1 is connected to the impeller shaft 2, the speed cam 3 is set on the impeller shaft 2, the first equal strength cantilever beam 10 is set on the side of the impeller shaft 2, the first equal strength cantilever The beam 10 is fixedly connected with the wind vane rotating shaft 4 through the fastening screw 7, the wind vane rotating shaft 4 is connected with the base 11 through the bearing 6, the tail of the wind vane rotating shaft 4 is provided with an empennage 5, the direction cam 8 and the angle cam 12 are arranged on the wind vane rotating shaft 4, and the wind vane rotating shaft 4 The second and third equal-strength cantilever beams 10 and third equal-strength cantil...
Embodiment 2
[0046] Embodiment 2: as Figure 1-4 As shown, a fiber Bragg grating dynamic anemometer, including impeller 1, impeller shaft 2, speed cam 3, vane shaft 4, empennage 5, bearing 6, fastening screw 7, direction cam 8, fiber Bragg grating 9, etc. Strength cantilever beam 10, base 11, angle cam 12; the impeller 1 is connected to the impeller shaft 2, the speed cam 3 is set on the impeller shaft 2, the first equal strength cantilever beam 10 is set on the side of the impeller shaft 2, the first equal strength cantilever The beam 10 is fixedly connected with the wind vane rotating shaft 4 through the fastening screw 7, the wind vane rotating shaft 4 is connected with the base 11 through the bearing 6, the tail of the wind vane rotating shaft 4 is provided with an empennage 5, the direction cam 8 and the angle cam 12 are arranged on the wind vane rotating shaft 4, and the wind vane rotating shaft 4 The second and third equal-strength cantilever beams 10 and third equal-strength cantil...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 