A hybrid simulation training system for smart substation
A smart substation and training system technology, applied in the field of training devices, can solve the problems of complex and diverse smart substation hybrid simulation training functions, high technical difficulty, high difficulty, etc., achieve strong maintainability, meet training requirements, reduce The effect of fees
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2016-06-08
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to devices for training. Background technique
[0002] With the rapid development of smart grid technology, technologies such as electronic transformers, intelligent high-voltage electrical appliances, optical fiber state-of-the-art networks, and IEC61850 standard communications have been gradually promoted and applied in smart substations. On-site operation and maintenance personnel lack understanding of new technologies and new equipment for smart grids. Most operation and maintenance personnel have not mastered the operation and maintenance technology of smart substations. It is urgent to conduct comprehensive smart substation training for substation operation and maintenance personnel. The existing training system for traditional substations is far from meeting the requirements of smart grid development, so it is necessary to research and develop a simulation training system for smart substations.
[0003] Usually, a smart su...
Examples
Embodiment Construction
[0024] Depend on figure 2 It can be seen from the figure that a smart substation hybrid simulation training system includes a power grid digital simulation system, a primary equipment simulation device and secondary equipment of a smart substation; the power grid digital simulation system includes a grid real-time simulation server, a trainer computer and an I / O interface ;The primary equipment simulation device includes electronic transformer simulation device, low-voltage switch simulation device, circuit breaker simulation device and knife switch simulation device;
[0025] The trainer computer is connected to the grid real-time simulation server, and the grid real-time simulation server is connected to the primary equipment simulation device through the I / O interface.
[0026] The connection between the primary equipment simulation device and the secondary equipment and between the secondary equipment is carried out according to the connection mode in the actual smart sub...