Overall track erection push system and erection push process of prefabricated highway steel bridge
A prefabricated, steel bridge technology, applied in the direction of erecting/assembling bridges, bridge construction, bridges, etc., can solve the problems of long bridge erection time, affecting the stability of steel bridges, shortening erection time, etc., to achieve high erection efficiency and erection time. Short, easy to erect effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0053] Embodiment: An integral track erection and pushing system for a prefabricated highway steel bridge. The prefabricated highway steel bridge is a cable-stayed prefabricated highway steel bridge. The ZB-200 type prefabricated highway steel bridge is used as the main girder 9, and the main girder passes through the tower The truss 8 in the beam consolidation area is fixed with a cable tower 7, and the cable tower is a "321" assembled highway steel bridge structure. The erection system consists of two parallel rail systems (see attached figure 1 attached figure 2 ), each track system consists of several sections of concrete pads 1 laid on land (see attached image 3 ) and fixedly laid on the concrete pad to form an integral steel rail 6, the laying position of the concrete pad is directly below the main girder of the land span after the steel bridge is erected as a bridge. Four traction trolleys 2 fixed to the steel bridge are placed on the two rails, and a flat roll supp...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 