Multi-user scheduling method and device
A multi-user and user technology, applied in the computer field, can solve the problems of high schedule management tools and insufficiency of schedule management tools, and achieve the effect of improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0022] figure 1 It is a flow chart of a multi-user scheduling method in the first embodiment of the present invention. The method in this embodiment can be executed by a multi-user scheduling device, which can be implemented by hardware and / or software, and can generally be integrated In the scheduling server, it is used in conjunction with the client of the scheduling software. The method of this embodiment specifically includes the following operations:
[0023] 110. Determine at least one piece of time schedule information of group activities of the at least two group users according to the existing schedule information of the at least two group users.
[0024] In this embodiment, a group is a group including at least two group users, which can be preset or initiated in real time to create a group. The existing schedule information of the at least two group users may be pre-stored inside the schedule server; or when there is a schedule requirement (for example, the schedu...
no. 2 example
[0044] figure 2 It is a flow chart of a multi-user scheduling method in the second embodiment of the present invention. This embodiment is optimized based on the above-mentioned embodiments. In this embodiment, it is preferable to use the existing schedules of at least two group users Arranging information, the optimization of the operation of determining at least one schedule information of the group activities of the at least two group users is as follows: according to the existing schedule information of the group users, a set of free time periods of the group users is determined, wherein, The set of free time periods includes at least one free time period; acquiring overlapping common free time periods in the set of free time periods as the schedule information of the group activity;
[0045] Preferably, according to the activity requirements of the group activities, the operation of determining at least one location arrangement information corresponding to the time arran...
no. 3 example
[0081] Figure 5 It is a flow chart of a multi-user scheduling method according to the third embodiment of the present invention. In this embodiment, preferably, a method is given to obtain geographical location information of group users before the start time node in the time schedule information according to the determined time schedule information.
[0082] Correspondingly, the method of this embodiment includes the following operations:
[0083] 510. Determine at least one time schedule information of group activities of the at least two group users according to the existing schedule information of the at least two group users.
[0084] 520. According to the determined time schedule information, sequentially acquire the closest existing schedule of a group user before the start time node of the schedule information.
[0085]530 . Determine whether the date of the schedule information in the existing schedule is the same as the schedule date of the determined schedule inf...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


