Protective Devices and Protective Methods
A protective device and protective spacing technology, applied in the direction of overhead lines/cable equipment, etc., can solve the problems of insufficient distance, UHV DC line does not meet the safety distance of radio stations, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] figure 1 is a block diagram showing the structure of the protective device 100 of the present invention. The protection device 100 includes: a determination unit 1 , a setting unit 2 , an acquisition unit 3 , a calculation unit 4 , and an arrangement unit 5 .
[0043] The determination unit 1 determines whether the actual protection distance is less than the protection distance threshold, and the setting unit 2 sets the height limit section when the determination unit 1 determines that the actual protection distance is less than the protection distance threshold.
[0044] Taking the Xiangjiaba-Shanghai ±800kV UHV DC transmission project as an example, image 3 It shows the relative position of the planned position of each line in the line corridor and the direction-finding antenna. The project line is near Haiwan Town, Fengxian District, Shanghai, and the vertical distance from the Shanghai Monitoring Station of the National Radio Monitoring Center is 1.55km. However,...
Embodiment 2
[0137] In addition to the above protection device, the present invention also provides a protection method. Specifically, the protection method adopts the judgment steps, setting steps, obtaining steps, and calculating steps similar to the judging unit 1, setting unit 2, acquiring unit 3, calculating unit 4, and arranging unit 5 in the guarding device. , and arrange steps to do the same protection. Therefore, the process of this method is similar to that described in Embodiment 1 above, and will not be repeated here.
[0138] Effect
[0139] When the present invention is applied to the Xiangjiaba-Shanghai ±800kV UHV DC transmission line, the A3 Expressway (Nanhenggang) section is planned in Fengxian District, and there is a monitoring station of the National Radio Monitoring Center in the area near the south side of the line, about 1.728km away from the power line , which is less than the spacing proposed by the national standard (GB13614-92) "Electromagnetic Environment Req...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


