Low energy consumption filling interception and dredging system
A technology of low energy consumption and interception wall, applied in the direction of aerobic process treatment, sustainable biological treatment, etc., can solve the problems of increasing the moving speed of filler, large area of interception net, and increased operating cost, so as to achieve the improvement of flow rate through holes and the operation Low cost and material saving effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The present invention will be further described below in conjunction with accompanying drawing.
[0023] Such as figure 2 , image 3 As shown, the low energy consumption filler interception and dredging system of the present invention is provided with a diversion wall 5 along the length direction in the sewage treatment tank, the front end of the diversion wall 5 is attached to the front pool wall, and the rear end of the diversion wall 5 is connected to the front pool wall. The distance between the rear pool wall is kept, the water inlet is set on one side of the front end of the diversion wall 5, the water outlet is set on the other side of the front end of the diversion wall 5, the sewage enters the pool through the water inlet, and bypasses the rear end of the diversion wall 5 , making a circle in the pool. In front of the water outlet, there is an interception wall 6 facing the direction of the water flow. The middle part of the interception wall 6 is provided w...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


