Composite cloth and preparation method thereof
A composite, cloth technology, applied in the field of cloth, can solve the problems of inability to shape, poor plasticity, etc., and achieve the effect of weakening the force, improving the surface quality of the product, and preventing mildew and corrosion.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Take 100 parts of water-based glue, 0.005 parts of thickener, stir at 300 rpm for 20 minutes to obtain glue, and apply the glue to the Oxford cloth base cloth to obtain a bonding layer. The amount of glue on the base cloth per square meter is 40 parts .
[0045] Take 100 parts of PVC powder, 30 parts of epoxy soybean oil, 105 parts of nano-calcium carbonate, 2.5 parts of paste lead barium, 2.5 parts of powdered barium cadmium zinc, 7 parts of titanium dioxide, 0.2 parts of whitening agent, 0.2 parts of ultramarine blue, PVC Mix 0.02 parts of special purple, and transfer the mixed material into an internal mixer. The mixed material is sheared by a powerful rotor in the banburying chamber, the banburying temperature is 120°C, and the banburying time is 10 minutes. After being filtered and transported to the extrusion equipment, the prepared PVC layer mixture is extruded onto the adhesive layer, calendered and laminated with a tape machine, and cooled. The temperatures of...
Embodiment 2
[0048] Take 100 parts of water-based glue, 0.006 parts of thickener, stir at 600 rpm for 20 minutes to obtain glue, and coat the glue on the Oxford cloth base cloth to obtain a bonding layer. The amount of glue on the Oxford cloth base cloth per square meter is 35 servings.
[0049] Take 96 parts of PVC powder, 27 parts of epoxy soybean oil, 100 parts of nano calcium carbonate, 2 parts of paste lead barium, 2 parts of powdery barium cadmium zinc, 5 parts of titanium dioxide, 0.5 parts of whitening agent, 0.5 parts of ultramarine blue, PVC Mix 0.5 parts of special purple, and transfer the mixed material into an internal mixer. The mixed material is sheared by a powerful rotor in the banburying chamber, the banburying temperature is 125°C, and the banburying time is 15 minutes. After being filtered and transported to the extrusion equipment, the prepared PVC layer mixture is extruded onto the adhesive layer, calendered and laminated with a tape machine, and cooled. The temperat...
Embodiment 3
[0052] Take 100 parts of water-based glue, 0.006 parts of thickener, stir at 500 rpm for 15 minutes to obtain glue, apply the glue to the Oxford cloth base cloth to obtain a bonding layer, and the amount of glue on the Oxford cloth base cloth per square meter is 50 servings.
[0053] Take 120 parts of PVC powder, 40 parts of epoxy soybean oil, 130 parts of nano-calcium carbonate, 5 parts of paste lead barium, 1 part of powdered barium cadmium zinc, 10 parts of titanium dioxide, 1 part of whitening agent, 1 part of ultramarine blue, PVC Mix 0.1 part of special purple, and transfer the mixed material into an internal mixer. The mixed material is sheared by a powerful rotor in the banburying chamber, the banburying temperature is 115°C, and the banburying time is 30 minutes. After being filtered and transported to the extrusion equipment, the prepared PVC layer mixture is extruded onto the adhesive layer, calendered and laminated with a tape machine, and cooled. The temperatures...
PUM
| Property | Measurement | Unit |
|---|---|---|
| hardness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 