Control method for sedimentation deformation during underground excavation construction
A control method and technology in construction, applied in soil protection, infrastructure engineering, construction, etc., can solve problems such as instability of excavation surface and hidden safety hazards, and achieve obvious effects and eliminate settlement factors.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] The invention provides a control method for settlement deformation in underground excavation construction, that is, during the excavation process of the underground passage, after the working surface of the side wall steel grid is excavated, the jack is placed on the lower end of the steel grid in advance, and the After the steel grid is installed, pressurize the jack, apply proper pressure to the soil below the steel grid to be installed, and compact the soil. After the steel grid is installed, replace the original jack with an adjustable jack , so that the steel grid will not cause a large settlement due to placement on virtual soil or soil with low compressive strength.
[0018] It specifically includes the following steps: A. After excavating the side wall steel grid work surface, pre-install the jack on the soil below the position where the steel grid is to be installed; B. Install the steel grid above the jack; C. Wait for the steel grid to be installed. After the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 