Road network and site linkage adjusting method
An adjustment method and site technology, applied in the integrated vertical optimization field of dynamic linkage adjustment of road network and site, can solve the problems of increased investment and workload, huge, difficult to use site renovation projects, etc., saving manpower and time costs Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] Below in conjunction with accompanying drawing and embodiment the present invention will be further described:
[0037] Such as figure 1 As shown, a road network and site linkage adjustment method includes the following steps:
[0038] Step 1: Obtain the road information and site information in the road network respectively.
[0039] Step 2. Associate the elevation of each site with the elevation of each road in the road network:
[0040] A1. Establish site list and road list;
[0041] A2. Take out each site G in the site list in turn, and establish the elevation association list R{r corresponding to G 1 ,r 2 ,...,r n}, n is the number of elements in the list R, and n is a natural number.
[0042] the r n is related information; r n ={Road name n, road associated position stake number n , the site-associated position n , the associated formula parameter n}; Wherein, the associated position of the venue is represented by coordinates (x, y). In this embodiment,...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 