Project dynamic management method and system

A dynamic management and engineering technology, applied in the field of construction engineering, can solve problems such as inability to change, being mobilized by personnel, and unable to continue the process, so as to achieve the effect of dynamic engineering management and convenient engineering management.

Inactive Publication Date: 2016-09-07
福建晨曦信息科技集团股份有限公司
View PDF3 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 1. The cycle of construction projects is long, and the time interval between each link is long. When the process is transferred to the executor of the next link, the executor has resigned or has been transferred by personnel, which makes the process unable to continue;
[0005] 2. When the subsequent link needs to be changed during the execution of the construction project, it cannot be changed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project dynamic management method and system
  • Project dynamic management method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0062] Please refer to Figure 1-2 , Embodiment 1 of the present invention is:

[0063] A kind of engineering dynamic management method provided by the present invention comprises:

[0064] An engineering task is created, and the engineering task includes a list and a plurality of subtasks; the list stores numbers of execution sequences of the plurality of subtasks; and the subtasks include task name, task execution content and task execution department.

[0065] Execute the subtasks sequentially according to the list; specifically:

[0066] When the task execution department receives the subtask, select the task executor according to the task name and task execution content;

[0067] When the task executor finishes executing the subtasks, he jumps to the task execution department corresponding to the next subtask according to the execution order in the list.

[0068] For the execution of subtasks, the list in the engineering task created by the present invention specifical...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the construction project field and relates to a project dynamic management method and a project dynamic management system. According to the project dynamic management method and system, when a project task is created, the execution order of sub tasks is determined; in the execution process of the project task, the executor of each sub task only needs to be responsible for the corresponding task and can skip without being responsible for selecting the executor of a next sub task; and as for a special field where the construction period of a construction project is long, the project dynamic management method provided by the invention can make project management be more convenient. Unified management is carried out by the background. When unexecuted sub tasks are needed to be changed, the sub tasks can be replaced through the serial numbers of the sub tasks, and therefore, project dynamic management can be realized.

Description

technical field [0001] The invention relates to the field of construction engineering, in particular to a method and system for engineering dynamic management. Background technique [0002] In the field of construction engineering, a construction project needs to go through more than a dozen steps or links from the start to the completion. The traditional management method adopts process management, which is similar to the OA process used in offices. When the first link is completed, the link The executor of the next link selects the executor of the next link. After completion, the process jumps to the executor of the next link. At this time, the executor of the current link starts to execute, and so on, until the executor of the last link completes, indicating that this item The project is completed. [0003] However, the traditional management methods have the following problems in the process of use: [0004] 1. The cycle of construction projects is long, and the time i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/0633G06Q50/08
Inventor 曾开发
Owner 福建晨曦信息科技集团股份有限公司