Unlock instant, AI-driven research and patent intelligence for your innovation.

Dynamic Control Method of Water Supply Reservoir Scheduling Diagram Based on Runoff Forecast

A technology of dynamic control and scheduling chart, applied in the field of water resources management and water conservancy project management, which can solve the problems of low water utilization rate, large water abandonment and damage of reservoirs, etc.

Active Publication Date: 2018-08-31
CHANGJIANG SURVEY PLANNING DESIGN & RES
View PDF9 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] In the actual dispatching operation, due to the great randomness in the distribution of the annual or interannual incoming water of the water supply reservoir, when the forecasted incoming water is relatively abundant, operating according to the guidance of the water supply dispatching map will cause a large amount of abandoned water in the reservoir, and the water utilization rate will be higher. Low; when the incoming water is predicted to be dry, normal scheduling according to the water supply scheduling map may cause insufficient water supply or even extreme damage in the later period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Dynamic Control Method of Water Supply Reservoir Scheduling Diagram Based on Runoff Forecast
  • Dynamic Control Method of Water Supply Reservoir Scheduling Diagram Based on Runoff Forecast
  • Dynamic Control Method of Water Supply Reservoir Scheduling Diagram Based on Runoff Forecast

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The implementation of the present invention will be described in detail below in conjunction with the accompanying drawings, but they do not constitute a limitation to the present invention, and are only examples. At the same time, the advantages of the present invention are clearer and easier to understand through the description.

[0032] The present invention is based on the runoff forecast dynamic control method of the water supply type reservoir scheduling map, including using long series of runoff data as the runoff into the reservoir, and is characterized in that it includes the following steps: first, carry out water supply scheduling calculations for all years by time period, avoiding the typical year The difference in selection and the problem of low guarantee rate due to the small number of samples; then, on the basis of using the conventional water supply dispatching line derivation method, the control factors of the water situation are introduced, and the lo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for dynamic control of a water-supply reservoir scheduling diagram based on runoff forecasting, and relates to the fields of water resource management and water conservancy project management. It includes the following steps: firstly, calculate the water supply dispatching time-by-period for all years, avoiding the difference in the selection of typical years and the problem of low guarantee rate due to the small number of samples; Introduce the control factor of the water situation, and select the relative position of the dispatching line in the dispatching diagram under the guidance of the long-term, medium-term and short-term hydrological runoff forecasts, so as to realize the dynamic control of the dispatching line under different flood and dry water conditions. It overcomes the problems of underrepresentation of typical years and failure to consider forecasted water in existing methods. It can comprehensively cover the incoming water and water demand that may occur in the water supply dispatching of the reservoir, and dynamically control the water supply mode according to the forecasted water abundance and dryness, so as to achieve the goal of optimal utilization of water resources.

Description

technical field [0001] The invention relates to the fields of water resources management and water conservancy project management, more specifically, it is a method for dynamic control of a water-supply reservoir scheduling diagram based on runoff forecasting. Background technique [0002] The reservoir water supply scheduling map is a tool to guide the annual or multi-year regulation of the water supply reservoir operation. The water supply scheduling map is drawn up based on the historical runoff statistical data of the reservoir and the corresponding design water demand flow data. water dispatch Figure 1 Generally, time is taken as the abscissa, and the reservoir water level (or storage capacity) is taken as the ordinate, and different water supply areas are divided by the guiding line for controlling the water supply mode, and its mathematical description can be expressed as: [0003] Q S =f(Z,T) [0004] Among them, Q s , Z, and T respectively represent the water su...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q50/00G06Q10/00E02B1/00
CPCE02B1/00
Inventor 张利升张睿饶光辉余蔚卿孟明星蔡淑兵胡向阳陈永生邹幼汉
Owner CHANGJIANG SURVEY PLANNING DESIGN & RES