Method of operation range calculation and judgment after single-vibration-area small hydropower station clustering control
A technology of operating range and cluster control, applied in the direction of single-network parallel feeding arrangement, etc., can solve the problems of cumbersome calculation and heavy workload, and achieve the effect of simple calculation and fast judgment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] A method for calculating and judging the operating range of a small hydropower cluster in a single vibration zone after control, which includes:
[0021] Step 1. Calculate the sum of the rated capacities of all units In the formula: w i is the rated capacity of unit i;
[0022] Step 2. Calculate the sum of the lower limit values of the vibration zones of all units In the formula: w i1 is the lower limit of the vibration zone of unit i;
[0023] Step 3. Calculate the minimum value W of the upper limit value of the vibration zone of all units 2 =min(w i2 ), where w i2 is the upper limit of the vibration zone of unit i;
[0024] Step 4. Calculate the maximum value max(w i2 );
[0025] Cluster control of small hydropower in single vibration areas in the same watershed or close to the geographical environment, and its capacity meets: That is, the sum of the lower limits of the vibration zone of all units plus the maximum value of the minimum unit capacity grea...