Unlock instant, AI-driven research and patent intelligence for your innovation.

Evaluation method for maintenance timing of track interlayer separation joints based on concrete elastic-plastic model

An elastoplastic model and concrete technology, applied in instrumentation, design optimization/simulation, calculation, etc., can solve problems such as lack of maintenance and repair, lack of operating experience, and exacerbation of diseases

Active Publication Date: 2019-07-12
BEIJING JIAOTONG UNIV +1
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] At present, due to the lack of operating experience and the lack of scientific theoretical guidance for maintenance and repair, the maintenance and repair department mostly adopts the method of "treating the head and feet with a headache" to deal with the above-mentioned problems such as separation seams and overhangs caused by temperature deformation and imbalance of the above-mentioned ballastless track. The method of "painful treatment" does not understand the force mechanism and damage mechanism of the track under the complex load combination, which leads to a certain lack of maintenance methods and maintenance timing, so that there will be more serious problems in winter for lines that are rehabilitated in summer. disease, disease in the adjacent area or on a larger scale in the line under partial treatment, disease in the previous year’s treatment still appeared or even worsened in the second year, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Evaluation method for maintenance timing of track interlayer separation joints based on concrete elastic-plastic model
  • Evaluation method for maintenance timing of track interlayer separation joints based on concrete elastic-plastic model
  • Evaluation method for maintenance timing of track interlayer separation joints based on concrete elastic-plastic model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] In order to illustrate the present invention more clearly, the present invention will be further described below in conjunction with preferred embodiments and accompanying drawings. Similar parts in the figures are denoted by the same reference numerals. Those skilled in the art should understand that the content specifically described below is illustrative rather than restrictive, and should not limit the protection scope of the present invention.

[0034] Such as figure 1 As shown, the method for evaluating the maintenance timing of track interlayer separation based on the concrete elastoplastic model includes the following steps:

[0035] 1. Determine the starting area of ​​the seam

[0036] 1.1 Use ABAQUS finite element software to establish the elastic-plastic hardening model of ballastless track, simulate the effect of temperature load under different working conditions, analyze the stress and deformation of each part of ballastless track, and then according to ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a concrete elastoplastic model-based track interlayer gap maintenance opportunity assessment method. The method comprises the following steps of building a ballastless track finite element model according to geometric sizes and physical attributes, actually measured on site, of a track structure; applying temperature loads in different working conditions to the model, and calculating and analyzing stress and deformation conditions of the ballastless track; determining an initial region in which a gap occurs according to a calculated stress and deformation nephogram of the ballastless track; calculating and analyzing occurrence and development conditions of the gap width and gap depth changed with the temperature in the gap region, performing comparison with existing standard ''high-speed railway ballastless track maintenance management measures'' in China, and judging a damage level; and based on an assessment level, determining a temperature change amplitude limit value and a time node corresponding to the temperature change amplitude limit value, thereby determining a reasonable maintenance opportunity. According to the method, the occurrence position of the gap can be determined and the evolutionary condition of the gap can be analyzed and predicted based on field track and environmental conditions, so that the reasonable track interlayer gap maintenance opportunity is proposed.

Description

technical field [0001] The invention relates to the field of ballastless track seamless lines. More specifically, it relates to an evaluation method for maintenance and repair of CRTS II ballastless slab track slabs. Background technique [0002] Ballastless track materials are complex, consisting of various materials such as concrete, mortar, emulsified asphalt, geotextiles and elastic buffer cushions; at the same time, its structure is extremely complex, with different types of ballastless track slabs, limit structures, Connecting parts, base, sliding layer and adhesive layer, etc.; the stress is restricted by the upper seamless line, lower subgrade, bridge and tunnel foundation, etc., and the stress transfer relationship between layers is complicated. This kind of ballastless track structure system with complex materials and structural types has more complex mechanical characteristics under the action of complex temperatures. Field surveys show that some ballastless tra...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F17/50
CPCG06F30/23
Inventor 高亮钟阳龙蔡小培阮庆伍梁淑娟徐旸侯博文肖宏
Owner BEIJING JIAOTONG UNIV