Building project progress and cost management system
A management system and construction engineering technology, applied in the field of project cost, can solve the problems of waste of human resources and low efficiency of project cost, and achieve the effect of easy real-time adjustment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] Such as figure 1 As shown, a construction project progress and cost management system includes a controller, an input unit, the input unit is connected to the controller, and the input unit inputs the completed cost process;
[0022] A storage unit, which is connected to the controller and used to store data related to the progress of the project cost;
[0023] The time unit is connected with the controller and used to store the real time of the controller;
[0024] The comparison unit is connected with the controller to compare the data of the storage unit and the time unit;
[0025] The display unit is connected with the controller, and is used to display the current progress and the comparison result of the comparison unit, and display the name of the next progress and the completion time.
[0026] Among them, an alarm unit is also included, which is connected with the controller, and the signal input end of the alarm unit is connected with the alarm signal output ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com